Supply · Global

1.1 billion carbon credits have been issued and never retired. Here is what they are.

The market’s inventory, by type and age. Cookstoves have retired 47% of what they issued; REDD+ 65%.

2.65 bncredits issued
1.56 bnretired
1.09 bnstill unretired
Carbon.Supply Analyst · registries as read 2026-10-01

Every credit a registry issues ends in one of two places: retired against someone’s claim, or still sitting in an account. The second pile is the market’s inventory, and it is the number that decides whether a new project can sell. According to the Berkeley Carbon Trading Project’s Voluntary Registry Offsets Database (release 2026-06), which covers Verra, Gold Standard, ACR, the Climate Action Reserve, ART and Isometric:

2.65 billion credits have been issued across 11,468 projects. 1.56 billion have been retired. 1.09 billion are still out there.

Not all inventory is the same. REDD+ has the largest unretired pile, 163 million credits, but 65% of what it issued has been retired. Cookstoves have retired only 47% of 230 million issued. Jurisdictional REDD+, almost all of it Guyana’s ART credits, has retired about a fifth. HFC and gas-leak projects sit at similar levels. Those are the types where a new project competes with old stock.

TypeIssued, MUnretired, MRetired share
REDD+46316365%
Wind35513363%
Cookstoves23012147%
Hydropower23510157%
Improved Forest Management2868969%
Solar - Centralized1285359%
Jurisdictional REDD+604722%
Landfill Methane1314665%
HFC Replacement in Foam Production463720%
Leak Detection & Repair in Gas Systems453424%
Afforestation/Reforestation792766%
HFC Refrigerant Reclamation302131%

The ten largest piles

ProjectTypeIssued, MUnretired, M
GuyanaART · GuyanaJurisdictional REDD+58.445.8
Cordillera Azul National Park REDD ProjectVCS · PeruREDD+36.620.8
The Mai Ndombe REDD+ ProjectVCS · DRCREDD+42.519.2
Southern Cardamom REDD+ ProjectVCS · CambodiaREDD+27.619.0
Hydroelectric Project in Kinnaur District in Himachal PradeshVCS · IndiaHydropower30.817.2
GS10884 - KOKO Kenya - Ethanol Cookstoves Program - CPA-0002GOLD · KenyaCookstoves14.914.8
Phlogiston Phase ICAR · United StatesN2O Destruction in Adipic Acid Production23.313.5
Reducing Gas Leakages within the Titas Gas Distribution Network in BangladeshVCS · BangladeshLeak Detection & Repair in Gas Systems12.411.8
Foz do Chapecó ProjectVCS · BrazilHydropower13.711.3
REDD project in Brazil nut concessions in Madre de Dios, PeruVCS · PeruREDD+19.110.6

Why a developer cares. If you are building a project of a type with a deep unretired pile, your offtaker can buy the old stock instead. That is the case for building to the integrity screens (CCP, CORSIA eligibility, Article 6 authorisation) that old stock cannot meet. The inventory is a price ceiling for everyone who does not.

Berkeley’s database is a research dataset compiled from registry records; it is updated a few times a year. We use it for issuance and retirement because the registries we read daily do not all publish volumes in a form we can track. We will move these figures to our own daily count as we add it.

Sources
Free weekly read

Registries read daily. Stories like this one, weekly.

Every status change on Verra, Gold Standard, Isometric and Equitable Earth, by region and by type, with the full project lists behind stories like this one.

Get the free weekly read →
More data stories
841 Mta year claimed by the pipeline
Pipeline · Global

2,814 carbon projects are waiting to be validated. Together they claim 841 million tonnes a year.

72%of the Philippine pipeline from two projects
Registry watch · Philippines

Two projects from one developer are 72% of the Philippines’ carbon pipeline

73%of the REDD+ queue on ruled-out methodologies
Methodology · REDD+

73% of REDD+ projects waiting at Verra list methodologies that cannot earn the CCP label

920registered projects late or on hold
Data · Global

920 registered carbon projects are late to verify, on hold or denied. India and China are 57% of them.

102registry changes, 20 September – 1 October
Registry log · Global

Eleven days on the registries: 102 changes, two withdrawals from China’s largest hog farmer, and India still listing solar