Countries › Chile
🇨🇱 Carbon projects in Chile
58 listed todayData as of 2026-11-23
Expected supply: biochar, dynamic-baseline nature and JCM
Carbon.Supply screening estimate, not a registry figure and not a forecast of prices. What these projects claim, discounted by how far each has got and by how much similar projects have delivered before. How we estimate it.
51k claimed for 20308k expected in 2030range 4k to 20k
| Group | Projects | Claimed 2030 | Expected 2030 | Range 2030 | Claimed 2026–2050 | Expected 2026–2050 |
|---|---|---|---|---|---|---|
| Biochar | 1 | 324 | 324 | 226–324 | 6,804 | 6,804 |
| Dynamic-baseline nature | 1 | 15,940 | 3,188 | 1,395–7,651 | 398,500 | 70,136 |
| JCM | 8 | 34,797 | 4,887 | 2,071–11,563 | 487,421 | 59,916 |
| All other types | 46 | 4,755,482 | 1,265,041 | 598,798–2,542,301 | 51,604,948 | 11,243,864 |
Focus projects
| Project | Registry | Group | Stage | Claimed 2030 | Expected 2030 | t CO2e per ha a year | Basis of the claim |
|---|---|---|---|---|---|---|---|
| MVC Biochar | Isometric prj_1K1T6SHXE1S0F3H4 | Biochar | Issuing | 324 | 324 | – | issued run rate (647 over 2 yr), one renewal assumed, to 2046 |
| Recovery of Degraded Native Forests in the Andean range of the Maule Region, Chile | Verra VCS 6073 | Dynamic-baseline nature | Pipeline | 15,940 | 3,188 | 4.7 | registry estimate 15,940 a year, 2026 to 2076 |
| 3.4MW Rice Husk Power Generation Project in Maule | JCM (Japan) CL008 | JCM | In validation | 9,357 | 1,235 | – | JCM yearly schedule to 2030, held at the 2030 level to 2039 |
| 9MW Solar Power Project in San Antonio, Valparaiso Region | JCM (Japan) CL005 | JCM | In validation | 8,233 | 1,087 | – | JCM yearly schedule to 2030, held at the 2030 level to 2039 |
| 9MW Solar Power Project in Yungay, Biobio Region | JCM (Japan) CL004 | JCM | In validation | 8,193 | 1,081 | – | JCM yearly schedule to 2030, held at the 2030 level to 2040 |
| 3MW Solar Power Project Utilizing Farmland in Maule Region | JCM (Japan) CL006 | JCM | In validation | 2,488 | 328 | – | JCM yearly schedule to 2030, held at the 2030 level to 2040 |
| 3MW Solar Power Project in Chillan, Nuble Region | JCM (Japan) CL002 | JCM | Registered, not yet issuing | 2,433 | 455 | – | JCM yearly schedule to 2030, held at the 2030 level to 2037 |
| 3MW Solar Power Project Utilizing Farmland in Valparaiso Region | JCM (Japan) CL003 | JCM | Registered, not yet issuing | 2,396 | 448 | – | JCM yearly schedule to 2030, held at the 2030 level to 2039 |
| Energy Supply Project by 2.0MW Rooftop Solar Power System to Industrial Plastic Plant in Renca, Santiago Metropolitan Region | JCM (Japan) CL007 | JCM | In validation | 1,180 | 156 | – | JCM yearly schedule to 2030, held at the 2030 level to 2040 |
| Introduction of 1MW Rooftop Solar Power Systems to University | JCM (Japan) CL001 | JCM | Registered, not yet issuing | 517 | 97 | – | JCM yearly schedule to 2030, held at the 2030 level to 2035 |
How we estimate it
Claimed volume comes from the project description's own yearly table where we have read it, otherwise from the registry's annual estimate over the crediting period, from JCM's own yearly schedule, or, for biochar, from the rate the project has already issued at. Expected volume multiplies it by the chance of reaching issuance from the current stage (central case: pipeline 40%, in validation 60%, registered and not yet issuing 85%, issuing 100%, at risk 30%) and by the share of their claim that similar projects have delivered (dynamic-baseline nature 50%, JCM 22%, biochar 100%, other types 36%), from Berkeley Carbon Trading Project data and the JCM registry. Credits start one to three years from now depending on stage. Carbon per hectare is the yearly average of the project description's table on the area that document gives, or else the registry estimate divided by the area the proponent entered; either can be a first planting instance rather than the whole project. Project descriptions stay on the registry: follow the project link to read them. Screening estimate, updated daily; the method will change as we read more design documents.
Issued and retired
From Verra's own issuance and retirement records, every row since the registry began, as of 2026-11-23. Gold Standard not yet included.
4,761,698 credits issued3,814,906 retired80.1% of issued credits retired1,155 retirements
Who the credits were retired for
| Beneficiary, as the registry publishes it | Credits retired | Retirements | Projects | Latest |
|---|---|---|---|---|
| Netflix, Inc | 460,525 | 3 | 1 | 2026-04-21 |
| Netflix | 331,600 | 1 | 1 | 2023-06-01 |
| Enel Generación Chile S.A | 176,773 | 2 | 1 | 2026-11-23 |
| Netflix Inc | 135,000 | 2 | 1 | 2021-08-06 |
| DL | 100,000 | 1 | 1 | 2021-09-28 |
| Ecologi Action Ltd | 75,000 | 3 | 1 | 2022-07-28 |
| ENDESA ENERGIA SA | 52,051 | 1 | 1 | 2022-09-13 |
| Compañia Siderurgica Huachipato (RUT 94.637.000-2) | 48,091 | 2 | 1 | 2024-03-13 |
| ENEL GENERACION CHILE S.A | 44,099 | 4 | 1 | 2025-02-18 |
| Kelar S.A | 37,344 | 5 | 2 | 2024-02-29 |
| OHLA Group (Obrascón Huarte Laín S.A.) | 32,000 | 1 | 1 | 2026-03-27 |
| E WIE EINFACH GmbH | 30,000 | 3 | 1 | 2022-04-12 |
| Goldman Sachs Group, Inc | 20,000 | 2 | 1 | 2022-02-10 |
| COPEC | 19,435 | 6 | 1 | 2026-11-04 |
| Zukunftswerk eG | 18,654 | 143 | 1 | 2026-11-20 |
| Other named beneficiaries | 236,399 | |||
| No public beneficiary | 1,997,935 |
Names are the registry's beneficial-owner field where the registry marks it public. Beneficiaries under 1,000 credits are not named here.
By vintage
| Vintage | Issued | Retired | issued retired |
|---|---|---|---|
| 2003 | 493,756 | 405,133 | |
| 2004 | 121,301 | 103,801 | |
| 2005 | 48,313 | 47,346 | |
| 2006 | 45,852 | 42,376 | |
| 2007 | 217,080 | 212,842 | |
| 2008 | 236,797 | 230,357 | |
| 2009 | 87,639 | 82,434 | |
| 2010 | 100,234 | 66,223 | |
| 2011 | 45,169 | 45,168 | |
| 2012 | 1,256,086 | 1,167,289 | |
| 2013 | 89,082 | 88,410 | |
| 2014 | 176,779 | 153,106 | |
| 2015 | 318,560 | 250,561 | |
| 2016 | 324,963 | 291,517 | |
| 2017 | 83,454 | 66,125 | |
| 2018 | 70,991 | 14,148 | |
| 2019 | 65,145 | 7,461 | |
| 2020 | 114,717 | 68,065 | |
| 2021 | 277,409 | 164,387 | |
| 2022 | 264,454 | 116,291 | |
| 2023 | 204,712 | 85,608 | |
| 2024 | 119,205 | 106,258 |
By year
| Year | Issued that year | Retired that year |
|---|---|---|
| 2010 | 70,492 | 0 |
| 2011 | 308,550 | 10,476 |
| 2012 | 0 | 126,257 |
| 2013 | 91,962 | 40,114 |
| 2014 | 317,663 | 67,440 |
| 2015 | 94,290 | 63,880 |
| 2016 | 15,732 | 138,953 |
| 2017 | 133,522 | 76,303 |
| 2018 | 157,353 | 131,712 |
| 2019 | 146,985 | 127,925 |
| 2020 | 202,671 | 48,992 |
| 2021 | 1,016,200 | 424,780 |
| 2022 | 882,149 | 763,749 |
| 2023 | 576,224 | 828,736 |
| 2024 | 167,540 | 316,794 |
| 2025 | 144,319 | 64,146 |
| 2026 | 436,046 | 584,649 |
By project
Every project
| Project | Registry | Country | Registry status | Carbon.Supply classification | First seen |
|---|---|---|---|---|---|
| Bundled Battery Energy Storage and Renewable Energy Generation by AES | Gold Standard 5387 | Chile | LISTED | Pipeline | 2026-09-20* |
| Cabo Leones Wind Farm | Gold Standard 4119 | Chile | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Canela Wind Farm Project | Gold Standard 1159 | Chile | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| Cururos Wind Farm Project | Gold Standard 630 | Chile | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Emission reduction from plastic recycling, Chile. | Gold Standard 4202 | Chile | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Los Hierros Hydroelectric Plant | Gold Standard 1274 | Chile | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| Santa Marta de Liray Indoor Mechanized Composting Project | Gold Standard 607 | Chile | LISTED | Pipeline | 2026-09-20* |
| Santa Marta Landfill Gas (LFG) Capture for Electricity Generation Project | Gold Standard 689 | Chile | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| EL AVELLANO - Pinus radiata Subsurface Biomass Storage | Isometric prj_1M3HW0W4F1S04606 | Chile | UNDER_VALIDATION | In validation | 2026-11-17 |
| MVC Biochar | Isometric prj_1K1T6SHXE1S0F3H4 | Chile | VALIDATED | Registered | 2026-09-21* |
| Patagonia WoodCell I | Isometric prj_1KVN4NCR11S0HD23 | Chile | UNDER_VALIDATION | In validation | 2026-09-21* |
| 3.4MW Rice Husk Power Generation Project in Maule | JCM (Japan) CL008 | Chile | Validation | In validation | 2026-10-31* |
| 3MW Solar Power Project in Chillan, Nuble Region | JCM (Japan) CL002 | Chile | Project registered | Registered | 2026-10-31* |
| 3MW Solar Power Project Utilizing Farmland in Maule Region | JCM (Japan) CL006 | Chile | Validation | In validation | 2026-10-31* |
| 3MW Solar Power Project Utilizing Farmland in Valparaiso Region | JCM (Japan) CL003 | Chile | Project registered | Registered | 2026-10-31* |
| 9MW Solar Power Project in San Antonio, Valparaiso Region | JCM (Japan) CL005 | Chile | Validation | In validation | 2026-10-31* |
| 9MW Solar Power Project in Yungay, Biobio Region | JCM (Japan) CL004 | Chile | Validation | In validation | 2026-10-31* |
| Energy Supply Project by 2.0MW Rooftop Solar Power System to Industrial Plastic Plant in Renca, Santiago Metropolitan Region | JCM (Japan) CL007 | Chile | Validation | In validation | 2026-10-31* |
| Introduction of 1MW Rooftop Solar Power Systems to University | JCM (Japan) CL001 | Chile | Project registered | Registered | 2026-10-31* |
| Alto Maipo Hydroelectric Project | Verra VCS 1321 | Chile | Verification approval requested | Registered | 2026-09-20* |
| AVOIDING PLANNED DEFORESTATION AND DEGRADATION IN THE VALDIVIAN COASTAL RESERVE, CHILE | Verra VCS 1175 | Chile | Registered | Registered | 2026-09-20* |
| Bosques Cautin S.A. Grouped Forest Carbon Project Through Extension of Rotation Age | Verra VCS 3734 | Chile | Registration requested | In validation | 2026-09-20* |
| Caelus Grouped Project | Verra VCS 2873 | Chile | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| CCB - VCS Project ID 15 dec 2023 – Bosques Cautin S.A. Forest Carbon Project II | Verra VCS 5273 | Chile | Withdrawn | Inactive | 2026-09-20* |
| Cerro Dominador Concentrating Solar Power Plant in Chile | Verra VCS 1998 | Chile | Registered | Registered | 2026-09-20* |
| Chacayes Hydroelectric Project, Chile | Verra VCS 1259 | Chile | Late to Verify | At risk | 2026-09-20* |
| Changing the way we move: Electric buses for mining companies | Verra VCS 5454 | Chile | Registered | Registered | 2026-09-20* |
| Chile: Hornitos Hydroelectric Project | Verra VCS 1038 | Chile | Late to Verify | At risk | 2026-09-20* |
| Chile: Lircay Run-Of-River Project | Verra VCS 522 | Chile | Late to Verify | At risk | 2026-09-20* |
| Chile: Quilleco Hydroelectric Project | Verra VCS 541 | Chile | Late to Verify | At risk | 2026-09-20* |
| Ecoprial Emission Avoidance Project | Verra VCS 5449 | Chile | Registered | Registered | 2026-09-20* |
| El Panul | Verra VCS 1228 | Chile | Late to Verify | At risk | 2026-09-20* |
| Electric Mobility Program Chile VCS | Verra VCS 5977 | Chile | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| FUEL REPLACEMENT WITH WASTE GAS STREAM CONTAINING HYDROGEN AND BIOMASS AT THE CMPC | Verra VCS 1053 | Chile | Late to Verify | At risk | 2026-09-20* |
| La Mina Hydropower Plant | Verra VCS 1554 | Chile | Registered | Registered | 2026-09-20* |
| La Yesca Landfill Gas Project | Verra VCS 4056 | Chile | Registered | Registered | 2026-09-20* |
| Lebu III Wind Farm Project | Verra VCS 1227 | Chile | Late to Verify | At risk | 2026-09-20* |
| Lican Hydroelectric Plant | Verra VCS 1083 | Chile | Registered | Registered | 2026-09-20* |
| Malleco, Lomas de Duqueco and Negrete Wind Project, Chile | Verra VCS 1978 | Chile | Rejected by Administrator | Inactive | 2026-09-20* |
| Mariposas Hydroelectric Project | Verra VCS 819 | Chile | Verification approval requested | Registered | 2026-09-20* |
| Methane capture and destruction on La Hormiga landfill in San Felipe and El Belloto landfill in Quilpue | Verra VCS 356 | Chile | Late to Verify | At risk | 2026-09-20* |
| MSA-1 Hydropower Plant | Verra VCS 1945 | Chile | Registered | Registered | 2026-09-20* |
| Ovejería Photovoltaic Power Plant | Verra VCS 1840 | Chile | Registered | Registered | 2026-09-20* |
| PANITAO Biomass Thermal Energy Project | Verra VCS 703 | Chile | Registered | Registered | 2026-09-20* |
| Patagonia IFM | Verra VCS 6195 | Chile | Under validation (Public comment period open) | In validation | 2026-09-20* |
| Proventus Grouped Project | Verra VCS 2874 | Chile | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Punta Colorada Wind Farm Project Phase I | Verra VCS 1149 | Chile | Late to Verify | At risk | 2026-09-20* |
| Recovery of Degraded Native Forests in the Andean range of the Maule Region, Chile | Verra VCS 6073 | Chile | Pipeline listing requested (under development) | Pipeline | 2026-09-20* |
| REDD+ NAHUELBUTA PROJECT | Verra VCS 3540 | Chile | Pipeline listing requested (under development) | Pipeline | 2026-09-20* |
| Reforestation of degraded lands in the Valle California of Patagonia, Chile | Verra VCS 886 | Chile | Late to Verify | At risk | 2026-09-20* |
| Reforesting Degraded Lands in Chile through the use of Mycorrhizal Inoculation | Verra VCS 1055 | Chile | Late to Verify | At risk | 2026-09-20* |
| Respira Patagonia | Verra VCS 5970 | Chile | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| San Clemente Hydroelectric Power Plant | Verra VCS 1028 | Chile | Late to Verify | At risk | 2026-09-20* |
| San Pedro Hydropower Plant | Verra VCS 1029 | Chile | Late to Verify | At risk | 2026-09-20* |
| SANTIAGO PONIENTE LANDFILL GAS PROJECT | Verra VCS 2573 | Chile | Registered | Registered | 2026-09-20* |
| Totoral Wind Farm Project | Verra VCS 973 | Chile | Registered | Registered | 2026-09-20* |
| TPP Forest Carbon | Verra VCS 6022 | Chile | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Viñales biomass power plant | Verra VCS 1186 | Chile | Crediting Period Renewal Requested | Registered | 2026-09-20* |
* already listed when we started reading that registry daily; the listing date is earlier.