49 listed todayData as of 2026-11-23

Expected supply: biochar, dynamic-baseline nature and JCM

Carbon.Supply screening estimate, not a registry figure and not a forecast of prices. What these projects claim, discounted by how far each has got and by how much similar projects have delivered before. How we estimate it.

68k claimed for 203014k expected in 2030range 6k to 32k

0 17k 34k 51k 68k 2029: 13,511 expected 2030: 13,511 expected 2031: 13,511 expected 2032: 13,511 expected 2033: 13,511 expected 2034: 13,511 expected 2035: 13,511 expected 2036: 13,511 expected 2037: 13,511 expected 2038: 13,511 expected 2039: 13,511 expected 2040: 13,511 expected 2041: 13,511 expected 2042: 13,511 expected 2043: 13,511 expected 2044: 13,511 expected 2045: 13,511 expected 2046: 13,511 expected 2030 2035 2040 2045 2050
Dynamic-baseline nature   claimed (dotted) · tCO2e a year, central case
GroupProjectsClaimed 2030Expected 2030Range 2030Claimed 2026–2050Expected 2026–2050
Dynamic-baseline nature2 (1 without a claim)67,55413,5115,911–32,4261,418,634243,198
All other types456,492,4751,459,543628,750–3,160,998155,570,95931,264,735

Focus projects

ProjectRegistryGroupStageClaimed 2030Expected 2030t CO2e per ha a yearBasis of the claim
La Tigra Watershed Conservation ARR/ANR Reforestation ProjectVerra VCS 5989Dynamic-baseline naturePipeline67,55413,51117.8registry estimate 67,554 a year, 2026 to 2046
La Muskitia Landscape ProjectEquitable Earth 2002Dynamic-baseline naturePipeline–––no annual estimate on the registry
How we estimate it

Claimed volume comes from the project description's own yearly table where we have read it, otherwise from the registry's annual estimate over the crediting period, from JCM's own yearly schedule, or, for biochar, from the rate the project has already issued at. Expected volume multiplies it by the chance of reaching issuance from the current stage (central case: pipeline 40%, in validation 60%, registered and not yet issuing 85%, issuing 100%, at risk 30%) and by the share of their claim that similar projects have delivered (dynamic-baseline nature 50%, JCM 22%, biochar 100%, other types 36%), from Berkeley Carbon Trading Project data and the JCM registry. Credits start one to three years from now depending on stage. Carbon per hectare is the yearly average of the project description's table on the area that document gives, or else the registry estimate divided by the area the proponent entered; either can be a first planting instance rather than the whole project. Project descriptions stay on the registry: follow the project link to read them. Screening estimate, updated daily; the method will change as we read more design documents.

Issued and retired

From Verra's own issuance and retirement records, every row since the registry began, as of 2026-11-23. Gold Standard not yet included.

403,504 credits issued395,208 retired97.9% of issued credits retired398 retirements

Who the credits were retired for

Beneficiary, as the registry publishes itCredits retiredRetirementsProjectsLatest
GP-024-Move for Good Mexico15,122612025-08-14
CH2M15,000112022-03-15
GP-036-Move for Good Argentina10,579212024-03-06
GP-031-Move for Good Brasil8,547712025-08-07
GP-024-Move for Good MX6,338112024-02-27
GP-355,000112022-11-04
GP-0362,380112023-04-28
Ash Ketchum1,500212021-04-16
GP-037-Move for Good UTA1,106412025-02-05
Other named beneficiaries7,261
No public beneficiary322,375

Names are the registry's beneficial-owner field where the registry marks it public. Beneficiaries under 1,000 credits are not named here.

By vintage

VintageIssuedRetiredissued retired
20076,8914,375
200824,00424,004
200918,79017,264
201022,61021,007
2011177,236177,236
201244,42544,425
201335,05732,406
201774,49174,491

By year

YearIssued that yearRetired that year
200914,8059,805
201017,78817,700
201147,28744,738
201202,524
2013161,9072,110
201435,0004,342
201527,22676,661
201625,000100,054
201703,600
20180254
20190196
20200572
202174,4913,934
2022076,054
202307,653
2024038,661
202506,350

By project

Every project

ProjectRegistryCountryRegistry statusCarbon.Supply classificationFirst seen
La Muskitia Landscape ProjectEquitable Earth 2002HondurasProject DesignPipeline2026-10-17
*EECOPALSA biogas capture & utilizationGold Standard 457HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
*Energeticos Jaremar - Biogas recovery from Palm Oil Mill Effluent (POME) ponds, and heat & electricity generation, HondurasGold Standard 837HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
*Proyecto Mirador enhanced distribution of efficient woodstovesGold Standard 1574HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
4C-Carbon - Honduras - VPA001Gold Standard 676HondurasLISTEDPipeline2026-09-20*
Aprosacao Reforestation Project: community reforestation and agroforestry with small-scale cocoa farmers in Honduras.Gold Standard 1808HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Betulia Hydroelectric projectGold Standard 222HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Clean Cookstoves Carbon Programme Central America PoA (4C-Carbon)Gold Standard 675HondurasLISTEDPipeline2026-09-20*
Cova Safe Water Program in Central AmericaGold Standard 5399HondurasLISTEDPipeline2026-09-20*
Cova Safe Water Project - HondurasGold Standard 5400HondurasLISTEDPipeline2026-09-20*
ERH – Biogas recovery, heat and electricity generation from effluents ponds in HondurasGold Standard 186HondurasLISTEDPipeline2026-09-20*
Filtering a better future: Ecofiltros by Hermandad de HondurasGold Standard 4455HondurasLISTEDPipeline2026-09-20*
Gasification Project ARIDEMAGold Standard 68HondurasGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS1290: Native Clean Water Programme Central America: VPA (01) HondurasGold Standard 1588HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS1290: Native Energy Clean Water Central America: VPA (04) Honduras (GS 7356)Gold Standard 1599HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS1377 Utsil Naj - Casa saludable para todos VPA3Gold Standard 353HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Guacamaya Small Scale Hydropower Programme of ActivitiesGold Standard 622HondurasGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Improved Cookstoves Program in Honduras "Vida Mejor con Ecofogones de AltoGold Standard 800HondurasGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Improved Cookstoves Project Activity in Honduras Vida Mejor con Ecofogones de Alto Rendimiento CPA No 001Gold Standard 390HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Improved Cookstoves Project Activity in Honduras Vida Mejor con Ecofogones de Alto Rendimiento CPA No 002Gold Standard 1069HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Improved Cookstoves Project Activity in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” – CPA No 001 Pre-CDM VERGold Standard 1702HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Improved Cookstoves Project Activity in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” – CPA No 003Gold Standard 1070HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Improved Cookstoves Project Activity in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” – CPA No 004Gold Standard 1071HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Improved Cookstoves Project Activity in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” – CPA No 005Gold Standard 1072HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Improved Cookstoves Project Activity in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” – CPA No 006Gold Standard 1073HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Improved Cookstoves Project Activity in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” – CPA No 007Gold Standard 1074HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Improved Cookstoves Project Activity in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” – CPA No 008Gold Standard 1075HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Improved Cookstoves Project Activity in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” – CPA No 009Gold Standard 1076HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
La Esperanza Hydroelectric ProjectGold Standard 677HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Native Energy Hydraid BioSand Water Filter Programme Central AmericaGold Standard 1589HondurasGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Native Hydraid BioSand Water Filter Program Central America: NE – VPA – 02 – HONGold Standard 1587HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Proyecto Mirador Enhanced Distribution of Improved Cookstove in Latin America – Fourth VPA for Distribution of Dos por Tres Cookstove in HondurasGold Standard 4930HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Proyecto Mirador Enhanced Distribution of Improved Cookstoves in Latin AmericaGold Standard 1691HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Proyecto Mirador Enhanced Distribution of Improved Cookstoves in Latin America - First VPA for Distribution of Dos por Tres Cookstoves in HondurasGold Standard 1575HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Puringla Sazagua Small Scale Hydropower ProjectGold Standard 723HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Safe Water Supply - Choluteca VPA 001(R)Gold Standard 3896HondurasLISTEDPipeline2026-09-20*
San Alejo Hydroelectric ProjectGold Standard 555HondurasGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Zinguizapa Small Scale Hydropower ProjectGold Standard 724HondurasGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Arenal Etapa I-II Hydroelectric ProjectVerra VCS 1557HondurasLate to VerifyAt risk2026-09-20*
Babilonia Hydroelectric ProjectVerra VCS 141HondurasLate to VerifyAt risk2026-09-20*
Cerro de Hula Wind ProjectVerra VCS 1077HondurasLate to VerifyAt risk2026-09-20*
Chamelecón 280 Hydroelectric projectVerra VCS 1420HondurasLate to VerifyAt risk2026-09-20*
Cuyamel Hydroelectric Project - CER ConversionVerra VCS 1449HondurasUnits transferred from approved GHG programRegistered2026-09-20*
FOREST CARBON FIXATION IN THE AREA OF INFLUENCE OF THE SANTA BARBARA MOUNTAIN, SANTA BARBARA, HONDURAS.Verra VCS 5393HondurasUnder validation (Public comment period closed)In validation2026-09-20*
FOREST CARBON FIXATION IN THE AREA OF INFLUENCE OF THE SANTA BARBARA MOUNTAIN, SANTA BARBARA, HONDURAS. ZONE 2Verra VCS 5532HondurasUnder validation (Public comment period closed)In validation2026-09-20*
Improved Cookstoves Program in Honduras “Vida Mejor con Ecofogones de Alto Rendimiento” - CER ConversionVerra VCS 2716HondurasUnits transferred from approved GHG programRegistered2026-09-20*
La Tigra Watershed Conservation ARR/ANR Reforestation ProjectVerra VCS 5989HondurasPipeline Listing (under development) approvedPipeline2026-09-20*
Muskitia Pâsa Klîn Nâka saVerra VCS 3294HondurasWithdrawnInactive2026-09-20*
Tradewater International HondurasVerra VCS 2596HondurasWithdrawnInactive2026-09-20*