LatestCountriesDevelopersSearch

Countries › Cambodia

🇰🇭 Carbon projects in Cambodia

57 listed todayData as of 2026-11-23

Read the Cambodia market guide → Policy, buyers and what to watch. This page is the full project list behind it.

Covered by the Southeast Asia edition of the Carbon.Supply briefing.

Expected supply: biochar, dynamic-baseline nature and JCM

Carbon.Supply screening estimate, not a registry figure and not a forecast of prices. What these projects claim, discounted by how far each has got and by how much similar projects have delivered before. How we estimate it.

1.0M claimed for 2030275k expected in 2030range 146k to 555k

0 260k 519k 779k 1.0M 2026: 170 expected 2026: 90,401 expected 2027: 170 expected 2027: 95,924 expected 2028: 170 expected 2028: 177,254 expected 2028: 98,329 expected 2029: 170 expected 2029: 177,254 expected 2029: 97,191 expected 2030: 170 expected 2030: 177,254 expected 2030: 97,191 expected 2031: 170 expected 2031: 177,254 expected 2031: 191 expected 2032: 170 expected 2032: 177,254 expected 2032: 191 expected 2033: 170 expected 2033: 177,254 expected 2033: 80 expected 2034: 170 expected 2034: 177,254 expected 2034: 80 expected 2035: 170 expected 2035: 177,254 expected 2035: 80 expected 2036: 170 expected 2036: 177,254 expected 2037: 177,254 expected 2038: 177,254 expected 2039: 177,254 expected 2040: 177,254 expected 2041: 177,254 expected 2042: 177,254 expected 2043: 177,254 expected 2044: 177,254 expected 2045: 177,254 expected 2046: 168,659 expected 2047: 168,659 expected 2048: 168,659 expected 2049: 168,659 expected 2050: 168,659 expected 2030 2035 2040 2045 2050
Biochar   Dynamic-baseline nature   JCM   claimed (dotted) · tCO2e a year, central case
GroupProjectsClaimed 2030Expected 2030Range 2030Claimed 2026–2050Expected 2026–2050
Biochar1170170119–1701,8701,870
Dynamic-baseline nature2590,848177,25493,059–378,14314,627,9504,033,867
JCM5442,10897,19152,996–176,7902,183,933479,658
All other types4822,004,6616,736,8513,522,514–12,136,251301,249,75785,266,357

Focus projects

ProjectRegistryGroupStageClaimed 2030Expected 2030t CO2e per ha a yearBasis of the claim
Foundation 1Puro.earth 526866BiocharIssuing170170–issued run rate (340 over 2 yr), one renewal assumed, to 2036
KRASOP BLUE CARBONVerra VCS 5584Dynamic-baseline natureIn validation562,198168,65918.1registry estimate 562,198 a year, 2024 to 2064
Mangrove afforestation and reforestation project in CambodiaVerra VCS 5071Dynamic-baseline natureIn validation28,6508,5959.6registry estimate 28,650 a year, 2025 to 2045
Prey Lang Wildlife Sanctuary - Stung Treng REDD+ projectJCM (Japan) KH005JCMIssuing440,91197,000–JCM yearly schedule to 2029, held at the 2029 level to 2030
Introduction of 1MW Solar Power System and High Efficiency Centrifugal Chiller in Large Shopping MallJCM (Japan) KH003JCMIn validation66388–JCM yearly schedule to 2030, held at the 2030 level to 2032
Energy Saving by Inverters for Distribution Pumps in Water Treatment PlantJCM (Japan) KH004JCMRegistered, not yet issuing43080–JCM yearly schedule to 2030, held at the 2030 level to 2035
Introduction of Ultra-lightweight Solar Panels for Power Generation at International SchoolJCM (Japan) KH001JCMIssuing10423–JCM yearly schedule to 2030, held at the 2030 level to 2032
Introduction of High Efficiency LED Lighting Utilizing Wireless NetworkJCM (Japan) KH002JCMIssuing00–JCM yearly schedule to 2028
How we estimate it

Claimed volume comes from the project description's own yearly table where we have read it, otherwise from the registry's annual estimate over the crediting period, from JCM's own yearly schedule, or, for biochar, from the rate the project has already issued at. Expected volume multiplies it by the chance of reaching issuance from the current stage (central case: pipeline 40%, in validation 60%, registered and not yet issuing 85%, issuing 100%, at risk 30%) and by the share of their claim that similar projects have delivered (dynamic-baseline nature 50%, JCM 22%, biochar 100%, other types 36%), from Berkeley Carbon Trading Project data and the JCM registry. Credits start one to three years from now depending on stage. Carbon per hectare is the yearly average of the project description's table on the area that document gives, or else the registry estimate divided by the area the proponent entered; either can be a first planting instance rather than the whole project. Project descriptions stay on the registry: follow the project link to read them. Screening estimate, updated daily; the method will change as we read more design documents.

Issued and retired

From Verra's own issuance and retirement records, every row since the registry began, as of 2026-11-23. Gold Standard not yet included.

54,582,245 credits issued25,566,573 retired46.8% of issued credits retired6,886 retirements

Who the credits were retired for

Beneficiary, as the registry publishes itCredits retiredRetirementsProjectsLatest
DL685,0001222021-12-08
GrabCar Sdn. Bhd501,2103112026-03-27
Delta Air Lines500,9871112021-10-06
Delta Air Lies457,000212021-06-30
Fleetcor Deutschland Gmbh452,6138022026-09-17
Grab Company Limited314,5171412026-03-27
The Walt Disney Company286,500512025-02-05
CMA CGM284,415712023-03-31
Booking Holdings Inc275,0001022024-06-10
Singapore Airlines Limited (Registered No: 197200078R)269,561212026-09-07
Grabtaxi (Thailand) Co., Ltd259,906912026-03-27
Bayer AG225,000922026-09-14
Interface, Inc217,2691122023-05-15
Bayer AG – Additional Climate Contribution 2026200,000112026-02-04
Grünwelt Wärmestrom GmbH200,000912026-05-22
Other named beneficiaries3,180,677
No public beneficiary17,256,918

Names are the registry's beneficial-owner field where the registry marks it public. Beneficiaries under 1,000 credits are not named here.

By vintage

VintageIssuedRetiredissued retired
200321,83313,333
200450,98029,221
200595,88085,019
200610,8878,716
2007126,022126,022
2008240,600177,008
2009268,573258,631
2010345,676344,158
2011349,352308,396
2012373,769373,769
20134,024,9174,023,617
20143,079,4963,079,495
20156,279,5034,295,905
20166,379,0262,869,396
20175,915,4912,356,387
20184,514,4881,508,990
20195,030,8361,449,279
20205,815,8452,127,520
20216,281,3151,631,528
2022581,787147,816
20231,765,052270,000
20241,988,49582,367
2025962,6620
202679,7600

By year

YearIssued that yearRetired that year
2009192,6000
2010574,17538,442
2011345,67680,869
2012349,35278,328
2013406,769171,528
2014177,34580,608
20158,000925,422
20160104,011
201723,116163,319
2018350,000152,621
20196,528,823606,599
20203,500,056505,743
202128,597,6949,221,004
202201,504,486
20238,300,1144,380,648
2024743,8751,718,308
2025580,4023,277,613
20263,904,2482,557,024

By project

Every project

ProjectRegistryCountryRegistry statusCarbon.Supply classificationFirst seen
Accelerating Clean Cooking Solutions Cambodia VPA01Gold Standard 1484CambodiaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Accelerating Clean Cooking Solutions in Cambodia – VPA04 (GS 6746)Gold Standard 1467CambodiaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Accelerating Clean Cooking Solutions in the Greater Mekong PoAGold Standard 889CambodiaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Anakot Thmei Safe Water ProjectGold Standard 3510CambodiaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
AWD Methane Reduction Project in CambodiaGold Standard 5636CambodiaLISTEDPipeline2026-09-20*
Electric Cooking Program by ATECGold Standard 3840CambodiaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS11993 VPA4: African Clean Energy for Cooking in CambodiaGold Standard 4642CambodiaLISTEDPipeline2026-09-20*
GS12967 VPA 01 Improved agricultural practices for rice cultivation in Cambodia.Gold Standard 5076CambodiaLISTEDPipeline2026-09-20*
GS13138 VPA1 Hygiene and Environmental Care for Tanks and Overhead Reservoirs (HECTOR) in CambodiaGold Standard 5407CambodiaLISTEDPipeline2026-09-20*
GS2404 International Water Purification Programme - CPA 4 Water Kiosks in CambodiaGold Standard 1630CambodiaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Hygiene and Environmental Care for Tanks and Overhead Reservoirs (HECTOR) in CambodiaGold Standard 5398CambodiaLISTEDPipeline2026-09-20*
Improved agricultural practices for Rice cultivation in CambodiaGold Standard 5075CambodiaLISTEDPipeline2026-09-20*
Improved Cookstove and Safe Drinking Water Project in Africa and AsiaGold Standard 4921CambodiaLISTEDPipeline2026-09-20*
Mekong 1: Methane Reduction from Rice Cultivation in CambodiaGold Standard 5010CambodiaLISTEDPipeline2026-09-20*
METHANE EMISSION REDUCTION BY AWD IN RICE FARMING IN CAMBODIAGold Standard 5306CambodiaLISTEDPipeline2026-09-20*
METHANE EMISSION REDUCTION BY AWD IN RICE FARMING IN CAMBODIA-VPA01Gold Standard 5307CambodiaLISTEDPipeline2026-09-20*
METHANE EMISSION REDUCTION BY AWD IN RICE FARMING IN CAMBODIA-VPA02Gold Standard 5308CambodiaLISTEDPipeline2026-09-20*
National Biodigester Programme CambodiaGold Standard 1176CambodiaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
National Biodigester Programme Phase IVGold Standard 3093CambodiaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
PoA GS11815- Electric Cooking Program by ATEC - Electric Cooking Program in Cambodia by ATEC-VPA01Gold Standard 3839CambodiaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Production and dissemination of Ceramic Water Purifiers by Hydrologic, in the Kingdom of CambodiaGold Standard 15CambodiaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Production of Char-Briquettes made from Agricultural Residues, CambodiaGold Standard 5664CambodiaLISTEDPipeline2026-09-20*
Thai Wah Biogas WWT ProjectGold Standard 4427CambodiaLISTEDPipeline2026-09-20*
Waste to energy using biomass Gasification in South East Asia LDCs programme of activitiesGold Standard 667CambodiaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Waste to energy using biomass Gasification in South East Asia LDCs programme of activities CPA-001Gold Standard 712CambodiaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Energy Saving by Inverters for Distribution Pumps in Water Treatment PlantJCM (Japan) KH004CambodiaProject registeredRegistered2026-10-31*
Introduction of 1MW Solar Power System and High Efficiency Centrifugal Chiller in Large Shopping MallJCM (Japan) KH003CambodiaValidationIn validation2026-10-31*
Introduction of High Efficiency LED Lighting Utilizing Wireless NetworkJCM (Japan) KH002CambodiaProject registeredRegistered2026-10-31*
Introduction of Ultra-lightweight Solar Panels for Power Generation at International SchoolJCM (Japan) KH001CambodiaProject registeredRegistered2026-10-31*
Prey Lang Wildlife Sanctuary - Stung Treng REDD+ projectJCM (Japan) KH005CambodiaProject registeredRegistered2026-10-31*
Foundation 1Puro.earth 526866CambodialistedRegistered2026-10-31*
150MW Wind Power Project in Mondulkiri Province, CambodiaVerra VCS 6290CambodiaPipeline listing requested (under development)Pipeline2026-10-19
26MWp Solar Photovoltaic Power Plant in Bavet City, CambodiaVerra VCS 4036CambodiaRegisteredRegistered2026-09-20*
AVC Biogas Wastewater Treatment ProjectVerra VCS 6220CambodiaUnder validation (Public comment period closed)In validation2026-09-20*
AVC Biomass Power ProjectVerra VCS 6221CambodiaUnder validation (Public comment period closed)In validation2026-09-20*
CAMBODIA PREY MOAN KHMER IMPROVED COOKSTOVE PROGRAM IVerra VCS 3116CambodiaRegisteredRegistered2026-09-20*
Central Cardamom REDD+ ProjectVerra VCS 4853CambodiaPipeline Listing (under development) approvedPipeline2026-09-20*
Cleaner Cooking Solutions ProgramVerra VCS 2409CambodiaRegisteredRegistered2026-09-20*
Fuel - Wood Saving with Improved Cookstoves in CambodiaVerra VCS 2120CambodiaLate to VerifyAt risk2026-09-20*
Fuel-Wood Saving with Improved Cookstoves in CambodiaVerra VCS 181CambodiaLate to VerifyAt risk2026-09-20*
Global Safe Drinking Water for Schools in CambodiaVerra VCS 5120CambodiaUnder validation (Public comment period closed)In validation2026-09-20*
Grouped Projects for Cambodia Improved CookstoveVerra VCS 2925CambodiaVerification approval requestedRegistered2026-09-20*
Grouped Projects For Cambodia Water PurifierVerra VCS 3052CambodiaVerification approval requestedRegistered2026-09-20*
Installation of high efficiency wood burning cookstoves in CambodiaVerra VCS 4313CambodiaRegisteredRegistered2026-09-20*
KAMPONG CHHNANG 60 MW SOLAR POWER PROJECTVerra VCS 4869CambodiaVerification approval requestedRegistered2026-09-20*
KRASOP BLUE CARBONVerra VCS 5584CambodiaUnder validation (Public comment period closed)In validation2026-09-25
Lomphat Wildlife Sanctuary REDD+ ProjectVerra VCS 3434CambodiaRegisteredRegistered2026-09-20*
Mangrove afforestation and reforestation project in CambodiaVerra VCS 5071CambodiaUnder validation (Public comment period closed)In validation2026-09-20*
Methane emissions reduction through feed supplement for ruminant animals in Cambodia by AgCoTechVerra VCS 5733CambodiaPipeline Listing (under development) approvedPipeline2026-09-20*
Northern Plains REDD+ ProjectVerra VCS 4317CambodiaUnder validation (Public comment period open)In validation2026-09-20*
Reduced Emissions from Deforestation and Degradation in Community Forests – Oddar Meanchey, CambodiaVerra VCS 904CambodiaLate to VerifyAt risk2026-09-20*
Reduced Emissions from Deforestation and Degradation in Keo Seima Wildlife SanctuaryVerra VCS 1650CambodiaRegisteredRegistered2026-09-20*
Samkos REDD+ ProjectVerra VCS 3341CambodiaInactiveInactive2026-09-20*
Solar Power Project by SOMA EnergyVerra VCS 3613CambodiaVerification approval request deniedAt risk2026-09-20*
Southern Cardamom REDD+ ProjectVerra VCS 1748CambodiaVerification approval requestedRegistered2026-09-20*
Tumring REDD+ ProjectVerra VCS 1689CambodiaLate to VerifyAt risk2026-09-20*
Water Purification System for Safe Drinking Water (SDW) in CambodiaVerra VCS 5066CambodiaRegisteredRegistered2026-09-20*

* already listed when we started reading that registry daily; the listing date is earlier.