Countries › Malaysia
🇲🇾 Carbon projects in Malaysia
36 listed todayData as of 2026-11-23
Read the Malaysia market guide → Policy, buyers and what to watch. This page is the full project list behind it.
Covered by the Southeast Asia edition of the Carbon.Supply briefing.
Expected supply: biochar, dynamic-baseline nature and JCM
Carbon.Supply screening estimate, not a registry figure and not a forecast of prices. What these projects claim, discounted by how far each has got and by how much similar projects have delivered before. How we estimate it.
2.4M claimed for 2030722k expected in 2030range 379k to 1.5M
| Group | Projects | Claimed 2030 | Expected 2030 | Range 2030 | Claimed 2026–2050 | Expected 2026–2050 |
|---|---|---|---|---|---|---|
| Dynamic-baseline nature | 2 | 2,407,604 | 721,521 | 378,665–1,539,650 | 60,190,100 | 16,593,462 |
| All other types | 34 | 5,474,677 | 1,195,655 | 526,141–2,545,978 | 104,841,525 | 20,144,729 |
Focus projects
| Project | Registry | Group | Stage | Claimed 2030 | Expected 2030 | t CO2e per ha a year | Basis of the claim |
|---|---|---|---|---|---|---|---|
| Pahang Peatland Restoration Project | Verra VCS 5474 | Dynamic-baseline nature | In validation | 2,400,000 | 720,000 | 24.9 | registry estimate 2,400,000 a year, 2024 to 2083 |
| SARAWAK BLUE CARBON INITIATIVE | Verra VCS 6015 | Dynamic-baseline nature | Pipeline | 7,604 | 1,521 | 0.6 | registry estimate 7,604 a year, 2026 to 2065 |
How we estimate it
Claimed volume comes from the project description's own yearly table where we have read it, otherwise from the registry's annual estimate over the crediting period, from JCM's own yearly schedule, or, for biochar, from the rate the project has already issued at. Expected volume multiplies it by the chance of reaching issuance from the current stage (central case: pipeline 40%, in validation 60%, registered and not yet issuing 85%, issuing 100%, at risk 30%) and by the share of their claim that similar projects have delivered (dynamic-baseline nature 50%, JCM 22%, biochar 100%, other types 36%), from Berkeley Carbon Trading Project data and the JCM registry. Credits start one to three years from now depending on stage. Carbon per hectare is the yearly average of the project description's table on the area that document gives, or else the registry estimate divided by the area the proponent entered; either can be a first planting instance rather than the whole project. Project descriptions stay on the registry: follow the project link to read them. Screening estimate, updated daily; the method will change as we read more design documents.
Issued and retired
From Verra's own issuance and retirement records, every row since the registry began, as of 2026-11-23. Gold Standard not yet included.
8,775,197 credits issued6,065,068 retired69.1% of issued credits retired1,654 retirements
Who the credits were retired for
| Beneficiary, as the registry publishes it | Credits retired | Retirements | Projects | Latest |
|---|---|---|---|---|
| Eni Plenitude SpA Società benefit | 1,147,595 | 13 | 1 | 2026-02-25 |
| Anonymous | 400,000 | 8 | 1 | 2024-08-01 |
| Eni Plenitude S.p. A Società Benefit | 311,290 | 4 | 1 | 2025-10-20 |
| Salesforce, Inc | 287,264 | 5 | 1 | 2025-12-15 |
| EY Global Services Limited | 276,104 | 6 | 1 | 2025-10-13 |
| Eni Plenitude S.p.A. Società Benefit | 188,132 | 3 | 1 | 2026-10-16 |
| EY Global Services Ltd | 103,453 | 4 | 1 | 2024-08-28 |
| Nestrade SA | 83,428 | 4 | 1 | 2026-11-02 |
| Eni Plenitude S.p.A Società Benefit | 80,727 | 1 | 1 | 2025-10-20 |
| Eni Gas and Power France | 77,252 | 1 | 1 | 2025-10-20 |
| Retiring on behalf of and for the benefit of JPMorgan Chase | 75,000 | 3 | 1 | 2025-02-12 |
| DNV AS | 32,000 | 2 | 1 | 2025-08-04 |
| GRABCAR SDN. BHD | 29,629 | 2 | 1 | 2026-03-27 |
| Retired on behalf of Autodesk, Inc | 25,000 | 6 | 1 | 2025-10-17 |
| LGT CP Portfolio Management SICAV | 23,492 | 4 | 1 | 2025-08-22 |
| Other named beneficiaries | 292,029 | |||
| No public beneficiary | 2,632,673 |
Names are the registry's beneficial-owner field where the registry marks it public. Beneficiaries under 1,000 credits are not named here.
By vintage
| Vintage | Issued | Retired | issued retired |
|---|---|---|---|
| 2007 | 534,627 | 509,540 | |
| 2009 | 10,692 | 10,692 | |
| 2011 | 31,000 | 19,401 | |
| 2012 | 31,000 | 18,194 | |
| 2013 | 31,000 | 19,399 | |
| 2014 | 31,000 | 19,591 | |
| 2015 | 31,000 | 19,589 | |
| 2016 | 227,144 | 204,973 | |
| 2017 | 414,618 | 391,698 | |
| 2018 | 617,154 | 603,173 | |
| 2019 | 1,018,082 | 1,001,720 | |
| 2020 | 1,139,187 | 948,725 | |
| 2021 | 1,028,777 | 897,177 | |
| 2022 | 819,455 | 554,971 | |
| 2023 | 855,916 | 768,380 | |
| 2024 | 901,736 | 35,036 | |
| 2025 | 1,052,809 | 42,809 |
By year
| Year | Issued that year | Retired that year |
|---|---|---|
| 2011 | 509,540 | 10,721 |
| 2012 | 25,087 | 47,205 |
| 2013 | 10,692 | 217,079 |
| 2014 | 0 | 38,622 |
| 2015 | 0 | 94,205 |
| 2016 | 0 | 92,957 |
| 2017 | 0 | 7,783 |
| 2018 | 0 | 3,238 |
| 2019 | 0 | 3,729 |
| 2020 | 0 | 258 |
| 2021 | 0 | 430 |
| 2022 | 0 | 4,005 |
| 2024 | 4,295,513 | 865,210 |
| 2025 | 1,574,813 | 3,597,029 |
| 2026 | 2,359,552 | 1,082,597 |
By project
| Project | Issued | Retired |
|---|---|---|
| KUAMUT RAINFOREST CONSERVATION PROJECT | 7,691,954 | 5,193,866 |
| INFAPRO Rehabilitation of logged-over dipterocarp forest in Sabah, Malaysia | 928,040 | 766,979 |
| Monsoon Methane Avoidance from Industrial Wastewater in Malaysia Grouped Project | 94,531 | 93,531 |
| Methane recovery and utilisation project at United Plantations Berhad, Jendarata Palm Oil Mill, Malaysia | 25,087 | 0 |
| MALAYSIA GROUPED BIOMASS WASTE RECOVERY AND UTILIZATION PROJECT | 20,000 | 0 |
| Sungai Kerling Hydropower Plant | 10,692 | 10,692 |
| SKS Go Green | 3,893 | 0 |
| WASTEWATER TO BIOGAS GROUPED PROJECT | 1,000 | 0 |
Every project
| Project | Registry | Country | Registry status | Carbon.Supply classification | First seen |
|---|---|---|---|---|---|
| Fuel-Switch Project Deriving Carbon Assets from the Use of Non-Edible Raw Agriculture-Derived Oil System (NERADO System) To Replace Heavy Fuel Oil For Aluminum Dross Recycling In Malaysia | Gold Standard 3377 | Malaysia | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| AMA08-W-10, METHANE RECOVERY IN WASTEWATER TREATMENT, KEDAH, MALAYSIA | Verra VCS 867 | Malaysia | Late to Verify | At risk | 2026-09-20* |
| AMA08-W-21, METHANE RECOVERY IN WASTEWATER TREATMENT JOHOR, MALAYSIA | Verra VCS 861 | Malaysia | Late to Verify | At risk | 2026-09-20* |
| AMA08-W-22, METHANE RECOVERY IN WASTEWATER TREATMENT JOHOR, MALAYSIA | Verra VCS 860 | Malaysia | Late to Verify | At risk | 2026-09-20* |
| AMA08-W-23, METHANE RECOVERY IN WASTEWATER TREATMENT SARAWAK, MALAYSIA | Verra VCS 864 | Malaysia | Late to Verify | At risk | 2026-09-20* |
| AMA08-W-24, METHANE RECOVERY IN WASTEWATER TREATMENT PAHANG, MALAYSIA | Verra VCS 862 | Malaysia | Registered | Registered | 2026-09-20* |
| AMA08-W-25, METHANE RECOVERY IN WASTEWATER TREATMENT PAHANG, MALAYSIA | Verra VCS 863 | Malaysia | Crediting Period Renewal and Verification Approval Requested | Registered | 2026-09-20* |
| BE GREEN BIOMASS WASTE-TO-FUEL PRODUCTION GROUP PROJECT (MALAYSIA) | Verra VCS 6065 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Bell Enviro -Malaysia Integrated Municipal Solid Waste Recovery and Processing Project | Verra VCS 5887 | Malaysia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Biomass Waste Recovery and Utilisation Project in Malaysia | Verra VCS 5899 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Bioneo Biomass Waste Stabilisation and Briquette Production Project (Malaysia) | Verra VCS 5948 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Bundled run-of-river mini hydro power projects at Sungai Sia and Sungai Benus, Pahang, Malaysia | Verra VCS 1552 | Malaysia | Late to Verify | At risk | 2026-09-20* |
| CE TECHNOLOGY FUEL SWITCH FOR CLEANROOM GLOVE INDUSTRY PROJECT, TAIPING | Verra VCS 1016 | Malaysia | Late to Verify | At risk | 2026-09-20* |
| Dungun Timber Complex (DTC) Forest Concession, Dungun, Terengganu Malaysia under IFM through Extension of Rotation Age | Verra VCS 5219 | Malaysia | Pipeline listing requested (under development) | Pipeline | 2026-09-20* |
| INFAPRO Rehabilitation of logged-over dipterocarp forest in Sabah, Malaysia | Verra VCS 672 | Malaysia | Registered | Registered | 2026-09-20* |
| Kenyir State Park Forest Conservation Porject | Verra VCS 3367 | Malaysia | Pipeline listing requested (under development) | Pipeline | 2026-09-20* |
| KUAMUT RAINFOREST CONSERVATION PROJECT | Verra VCS 2609 | Malaysia | Registered | Registered | 2026-09-20* |
| MALAYSIA GROUPED BIOMASS WASTE RECOVERY AND UTILIZATION PROJECT | Verra VCS 5542 | Malaysia | Registered | Registered | 2026-09-20* |
| Malaysia Grouped Biomass Waste Stabilization and Pelletization Project by Taiyo Biomass | Verra VCS 5784 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Malaysia Grouped Landfill Methane Gas Recovery to Energy by Selekta Spektra and Teraju Sepadu | Verra VCS 6014 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| MALAYSIA RENEWABLE BIOENERGY GROUPED PROJECT BY CARBONTRACE | Verra VCS 4964 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Malaysian Paddy dMRV Program | Verra VCS 6139 | Malaysia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Marudi Peat Swamp Forest Conservation and Restoration Project | Verra VCS 4814 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Methane Avoidance Project through the Solids Removal & Oil Recovery System (SRORS) | Verra VCS 6088 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Methane recovery and utilisation project at United Plantations Berhad, Jendarata Palm Oil Mill, Malaysia | Verra VCS 769 | Malaysia | Late to Verify | At risk | 2026-09-20* |
| Monsoon Methane Avoidance from Industrial Wastewater in Malaysia Grouped Project | Verra VCS 4279 | Malaysia | Registered | Registered | 2026-09-20* |
| MY08-WWP-26, METHANE RECOVERY IN WASTEWATER TREATMENT PAHANG, MALAYSIA | Verra VCS 865 | Malaysia | Registered | Registered | 2026-09-20* |
| Pahang Peatland Restoration Project | Verra VCS 5474 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| REGENERATIVE AGRICULTURE CARBON OFFSETTING (RACO) GROUP PROJECT | Verra VCS 5807 | Malaysia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| SARAWAK BLUE CARBON INITIATIVE | Verra VCS 6015 | Malaysia | Pipeline listing requested (under validation) | Pipeline | 2026-11-05 |
| Saxon EVolve Program – EV Charging System Grouped Project | Verra VCS 5416 | Malaysia | Registered | Registered | 2026-09-20* |
| Seri Bandar Biomass and Biogas Bioenergy Project (Malaysia) | Verra VCS 5947 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| SKS Go Green | Verra VCS 5275 | Malaysia | Registered | Registered | 2026-09-20* |
| Sungai Kerling Hydropower Plant | Verra VCS 968 | Malaysia | Late to Verify | At risk | 2026-09-20* |
| WASTEWATER TO BIOGAS GROUPED PROJECT | Verra VCS 4887 | Malaysia | Registered | Registered | 2026-09-20* |
| XSD Biomass Waste Recovery and Utilisation Project | Verra VCS 6082 | Malaysia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
* already listed when we started reading that registry daily; the listing date is earlier.