LatestCountriesDevelopersSearch

Countries › Malaysia

🇲🇾 Carbon projects in Malaysia

36 listed todayData as of 2026-11-23

Read the Malaysia market guide → Policy, buyers and what to watch. This page is the full project list behind it.

Covered by the Southeast Asia edition of the Carbon.Supply briefing.

Expected supply: biochar, dynamic-baseline nature and JCM

Carbon.Supply screening estimate, not a registry figure and not a forecast of prices. What these projects claim, discounted by how far each has got and by how much similar projects have delivered before. How we estimate it.

2.4M claimed for 2030722k expected in 2030range 379k to 1.5M

0 602k 1.2M 1.8M 2.4M 2028: 720,000 expected 2029: 721,521 expected 2030: 721,521 expected 2031: 721,521 expected 2032: 721,521 expected 2033: 721,521 expected 2034: 721,521 expected 2035: 721,521 expected 2036: 721,521 expected 2037: 721,521 expected 2038: 721,521 expected 2039: 721,521 expected 2040: 721,521 expected 2041: 721,521 expected 2042: 721,521 expected 2043: 721,521 expected 2044: 721,521 expected 2045: 721,521 expected 2046: 721,521 expected 2047: 721,521 expected 2048: 721,521 expected 2049: 721,521 expected 2050: 721,521 expected 2030 2035 2040 2045 2050
Dynamic-baseline nature   claimed (dotted) · tCO2e a year, central case
GroupProjectsClaimed 2030Expected 2030Range 2030Claimed 2026–2050Expected 2026–2050
Dynamic-baseline nature22,407,604721,521378,665–1,539,65060,190,10016,593,462
All other types345,474,6771,195,655526,141–2,545,978104,841,52520,144,729

Focus projects

ProjectRegistryGroupStageClaimed 2030Expected 2030t CO2e per ha a yearBasis of the claim
Pahang Peatland Restoration ProjectVerra VCS 5474Dynamic-baseline natureIn validation2,400,000720,00024.9registry estimate 2,400,000 a year, 2024 to 2083
SARAWAK BLUE CARBON INITIATIVEVerra VCS 6015Dynamic-baseline naturePipeline7,6041,5210.6registry estimate 7,604 a year, 2026 to 2065
How we estimate it

Claimed volume comes from the project description's own yearly table where we have read it, otherwise from the registry's annual estimate over the crediting period, from JCM's own yearly schedule, or, for biochar, from the rate the project has already issued at. Expected volume multiplies it by the chance of reaching issuance from the current stage (central case: pipeline 40%, in validation 60%, registered and not yet issuing 85%, issuing 100%, at risk 30%) and by the share of their claim that similar projects have delivered (dynamic-baseline nature 50%, JCM 22%, biochar 100%, other types 36%), from Berkeley Carbon Trading Project data and the JCM registry. Credits start one to three years from now depending on stage. Carbon per hectare is the yearly average of the project description's table on the area that document gives, or else the registry estimate divided by the area the proponent entered; either can be a first planting instance rather than the whole project. Project descriptions stay on the registry: follow the project link to read them. Screening estimate, updated daily; the method will change as we read more design documents.

Issued and retired

From Verra's own issuance and retirement records, every row since the registry began, as of 2026-11-23. Gold Standard not yet included.

8,775,197 credits issued6,065,068 retired69.1% of issued credits retired1,654 retirements

Who the credits were retired for

Beneficiary, as the registry publishes itCredits retiredRetirementsProjectsLatest
Eni Plenitude SpA Società benefit1,147,5951312026-02-25
Anonymous400,000812024-08-01
Eni Plenitude S.p. A Società Benefit311,290412025-10-20
Salesforce, Inc287,264512025-12-15
EY Global Services Limited276,104612025-10-13
Eni Plenitude S.p.A. Società Benefit188,132312026-10-16
EY Global Services Ltd103,453412024-08-28
Nestrade SA83,428412026-11-02
Eni Plenitude S.p.A Società Benefit80,727112025-10-20
Eni Gas and Power France77,252112025-10-20
Retiring on behalf of and for the benefit of JPMorgan Chase75,000312025-02-12
DNV AS32,000212025-08-04
GRABCAR SDN. BHD29,629212026-03-27
Retired on behalf of Autodesk, Inc25,000612025-10-17
LGT CP Portfolio Management SICAV23,492412025-08-22
Other named beneficiaries292,029
No public beneficiary2,632,673

Names are the registry's beneficial-owner field where the registry marks it public. Beneficiaries under 1,000 credits are not named here.

By vintage

VintageIssuedRetiredissued retired
2007534,627509,540
200910,69210,692
201131,00019,401
201231,00018,194
201331,00019,399
201431,00019,591
201531,00019,589
2016227,144204,973
2017414,618391,698
2018617,154603,173
20191,018,0821,001,720
20201,139,187948,725
20211,028,777897,177
2022819,455554,971
2023855,916768,380
2024901,73635,036
20251,052,80942,809

By year

YearIssued that yearRetired that year
2011509,54010,721
201225,08747,205
201310,692217,079
2014038,622
2015094,205
2016092,957
201707,783
201803,238
201903,729
20200258
20210430
202204,005
20244,295,513865,210
20251,574,8133,597,029
20262,359,5521,082,597

By project

Every project

ProjectRegistryCountryRegistry statusCarbon.Supply classificationFirst seen
Fuel-Switch Project Deriving Carbon Assets from the Use of Non-Edible Raw Agriculture-Derived Oil System (NERADO System) To Replace Heavy Fuel Oil For Aluminum Dross Recycling In MalaysiaGold Standard 3377MalaysiaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
AMA08-W-10, METHANE RECOVERY IN WASTEWATER TREATMENT, KEDAH, MALAYSIAVerra VCS 867MalaysiaLate to VerifyAt risk2026-09-20*
AMA08-W-21, METHANE RECOVERY IN WASTEWATER TREATMENT JOHOR, MALAYSIAVerra VCS 861MalaysiaLate to VerifyAt risk2026-09-20*
AMA08-W-22, METHANE RECOVERY IN WASTEWATER TREATMENT JOHOR, MALAYSIAVerra VCS 860MalaysiaLate to VerifyAt risk2026-09-20*
AMA08-W-23, METHANE RECOVERY IN WASTEWATER TREATMENT SARAWAK, MALAYSIAVerra VCS 864MalaysiaLate to VerifyAt risk2026-09-20*
AMA08-W-24, METHANE RECOVERY IN WASTEWATER TREATMENT PAHANG, MALAYSIAVerra VCS 862MalaysiaRegisteredRegistered2026-09-20*
AMA08-W-25, METHANE RECOVERY IN WASTEWATER TREATMENT PAHANG, MALAYSIAVerra VCS 863MalaysiaCrediting Period Renewal and Verification Approval RequestedRegistered2026-09-20*
BE GREEN BIOMASS WASTE-TO-FUEL PRODUCTION GROUP PROJECT (MALAYSIA)Verra VCS 6065MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*
Bell Enviro -Malaysia Integrated Municipal Solid Waste Recovery and Processing ProjectVerra VCS 5887MalaysiaPipeline Listing (under development) approvedPipeline2026-09-20*
Biomass Waste Recovery and Utilisation Project in MalaysiaVerra VCS 5899MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*
Bioneo Biomass Waste Stabilisation and Briquette Production Project (Malaysia)Verra VCS 5948MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*
Bundled run-of-river mini hydro power projects at Sungai Sia and Sungai Benus, Pahang, MalaysiaVerra VCS 1552MalaysiaLate to VerifyAt risk2026-09-20*
CE TECHNOLOGY FUEL SWITCH FOR CLEANROOM GLOVE INDUSTRY PROJECT, TAIPINGVerra VCS 1016MalaysiaLate to VerifyAt risk2026-09-20*
Dungun Timber Complex (DTC) Forest Concession, Dungun, Terengganu Malaysia under IFM through Extension of Rotation AgeVerra VCS 5219MalaysiaPipeline listing requested (under development)Pipeline2026-09-20*
INFAPRO Rehabilitation of logged-over dipterocarp forest in Sabah, MalaysiaVerra VCS 672MalaysiaRegisteredRegistered2026-09-20*
Kenyir State Park Forest Conservation PorjectVerra VCS 3367MalaysiaPipeline listing requested (under development)Pipeline2026-09-20*
KUAMUT RAINFOREST CONSERVATION PROJECTVerra VCS 2609MalaysiaRegisteredRegistered2026-09-20*
MALAYSIA GROUPED BIOMASS WASTE RECOVERY AND UTILIZATION PROJECTVerra VCS 5542MalaysiaRegisteredRegistered2026-09-20*
Malaysia Grouped Biomass Waste Stabilization and Pelletization Project by Taiyo BiomassVerra VCS 5784MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*
Malaysia Grouped Landfill Methane Gas Recovery to Energy by Selekta Spektra and Teraju SepaduVerra VCS 6014MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*
MALAYSIA RENEWABLE BIOENERGY GROUPED PROJECT BY CARBONTRACEVerra VCS 4964MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*
Malaysian Paddy dMRV ProgramVerra VCS 6139MalaysiaPipeline Listing (under development) approvedPipeline2026-09-20*
Marudi Peat Swamp Forest Conservation and Restoration ProjectVerra VCS 4814MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*
Methane Avoidance Project through the Solids Removal & Oil Recovery System (SRORS)Verra VCS 6088MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*
Methane recovery and utilisation project at United Plantations Berhad, Jendarata Palm Oil Mill, MalaysiaVerra VCS 769MalaysiaLate to VerifyAt risk2026-09-20*
Monsoon Methane Avoidance from Industrial Wastewater in Malaysia Grouped ProjectVerra VCS 4279MalaysiaRegisteredRegistered2026-09-20*
MY08-WWP-26, METHANE RECOVERY IN WASTEWATER TREATMENT PAHANG, MALAYSIAVerra VCS 865MalaysiaRegisteredRegistered2026-09-20*
Pahang Peatland Restoration ProjectVerra VCS 5474MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*
REGENERATIVE AGRICULTURE CARBON OFFSETTING (RACO) GROUP PROJECTVerra VCS 5807MalaysiaPipeline Listing (under development) approvedPipeline2026-09-20*
SARAWAK BLUE CARBON INITIATIVEVerra VCS 6015MalaysiaPipeline listing requested (under validation)Pipeline2026-11-05
Saxon EVolve Program – EV Charging System Grouped ProjectVerra VCS 5416MalaysiaRegisteredRegistered2026-09-20*
Seri Bandar Biomass and Biogas Bioenergy Project (Malaysia)Verra VCS 5947MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*
SKS Go GreenVerra VCS 5275MalaysiaRegisteredRegistered2026-09-20*
Sungai Kerling Hydropower PlantVerra VCS 968MalaysiaLate to VerifyAt risk2026-09-20*
WASTEWATER TO BIOGAS GROUPED PROJECTVerra VCS 4887MalaysiaRegisteredRegistered2026-09-20*
XSD Biomass Waste Recovery and Utilisation ProjectVerra VCS 6082MalaysiaUnder validation (Public comment period closed)In validation2026-09-20*

* already listed when we started reading that registry daily; the listing date is earlier.