Countries βΊ Thailand
πΉπ Carbon projects in Thailand
138 listed todayData as of 2026-11-23
Read the Thailand market guide β Policy, buyers and what to watch. This page is the full project list behind it.
Covered by the Southeast Asia edition of the Carbon.Supply briefing.
Expected supply: biochar, dynamic-baseline nature and JCM
Carbon.Supply screening estimate, not a registry figure and not a forecast of prices. What these projects claim, discounted by how far each has got and by how much similar projects have delivered before. How we estimate it.
149k claimed for 203027k expected in 2030range 12k to 61k
| Group | Projects | Claimed 2030 | Expected 2030 | Range 2030 | Claimed 2026β2050 | Expected 2026β2050 |
|---|---|---|---|---|---|---|
| Biochar | 1 | 334 | 334 | 234β334 | 3,674 | 3,674 |
| Dynamic-baseline nature | 1 | 58,296 | 11,659 | 5,101β27,982 | 1,457,400 | 256,498 |
| JCM | 31 | 89,956 | 14,889 | 6,852β33,049 | 753,106 | 100,741 |
| All other types | 96 | 2,844,161 | 884,074 | 467,389β1,569,753 | 25,368,721 | 7,233,097 |
Focus projects
| Project | Registry | Group | Stage | Claimed 2030 | Expected 2030 | t CO2e per ha a year | Basis of the claim |
|---|---|---|---|---|---|---|---|
| SCG | Puro.earth 133972 | Biochar | Issuing | 334 | 334 | β | issued run rate (668 over 2 yr), one renewal assumed, to 2036 |
| THAMMA RAKSA - REFORESTATION AND LAND RESTORATION IN THAILAND | Verra VCS 3581 | Dynamic-baseline nature | Pipeline | 58,296 | 11,659 | 4.7 | registry estimate 58,296 a year, 2024 to 2064 |
| Power Generation by Waste Heat Recovery in Cement Industry | JCM (Japan) TH006 | JCM | Registered, not yet issuing | 29,746 | 5,563 | β | JCM yearly schedule to 2030, held at the 2030 level to 2032 |
| Low-carbon Operation for Power Grid Utilizing Online Voltage-var(Q) Optimal Control (OPENVQ) with ICT | JCM (Japan) TH024 | JCM | In validation | 17,956 | 2,370 | β | JCM yearly schedule to 2030 |
| Introduction of 30MW Rooftop Solar Power System to Large Supermarkets | JCM (Japan) TH009 | JCM | Registered, not yet issuing | 13,293 | 2,486 | β | JCM yearly schedule to 2030, held at the 2030 level to 2034 |
| 17.8MW Rooftop and Floating Solar Power Project in Industrial Park | JCM (Japan) TH027 | JCM | In validation | 7,471 | 986 | β | JCM yearly schedule to 2030, held at the 2030 level to 2039 |
| Installation of Co-Generation Plant for On-Site Energy Supply and High Efficiency Non-Inverter Type Centrifugal Chiller in Motorcycle Factory | JCM (Japan) TH013 | JCM | Registered, not yet issuing | 7,262 | 1,358 | β | JCM yearly schedule to 2030, held at the 2030 level to 2032 |
| Introduction of 8.1MW Rooftop Solar Power System in Motorcycle Factory and Fiber Factory | JCM (Japan) TH028 | JCM | In validation | 3,648 | 482 | β | JCM yearly schedule to 2030, held at the 2030 level to 2038 |
| Introduction of 5MW Floating Solar Power System on Industrial Water Reservoir in Thailand | JCM (Japan) TH014 | JCM | Issuing | 2,552 | 561 | β | JCM yearly schedule to 2030, held at the 2030 level to 2036 |
| Introduction of 5MW Rooftop Solar Power System to Aluminum Building Materials Factory | JCM (Japan) TH033 | JCM | In validation | 2,103 | 278 | β | JCM yearly schedule to 2030, held at the 2030 level to 2031 |
| Introduction of 3.4 MW Rooftop Solar Power System in Technical Center and Office Buildings | JCM (Japan) TH015 | JCM | In validation | 1,417 | 187 | β | JCM yearly schedule to 2030, held at the 2030 level to 2033 |
| Introduction of 2.6MW Rooftop Solar Power System to Semiconductor Factory | JCM (Japan) TH029 | JCM | In validation | 1,159 | 153 | β | JCM yearly schedule to 2030, held at the 2030 level to 2038 |
| Introduction of 2MW Rooftop Solar Power System to Non-ferrous Metal Factory | JCM (Japan) TH030 | JCM | In validation | 905 | 119 | β | JCM yearly schedule to 2030, held at the 2030 level to 2039 |
| Introduction of 2MW Rooftop Solar Power System to University | JCM (Japan) TH034 | JCM | In validation | 831 | 110 | β | JCM yearly schedule to 2030, held at the 2030 level to 2039 |
| Introduction of 0.8MW Solar Power System and High Efficiency Refrigerator to Food Factory | JCM (Japan) TH022 | JCM | Registered, not yet issuing | 433 | 81 | β | JCM yearly schedule to 2030 |
| Introduction of 0.97 MW Rooftop Solar Power System for Fishery Net Factory | JCM (Japan) TH017 | JCM | In validation | 425 | 56 | β | JCM yearly schedule to 2030, held at the 2030 level to 2035 |
| Introduction of 0.95 MW Rooftop Solar Power System in Cigarette Lighter Factory | JCM (Japan) TH016 | JCM | In validation | 400 | 53 | β | JCM yearly schedule to 2030, held at the 2030 level to 2035 |
| Energy Supply Project by 0.9MW Rooftop Solar Power System to Metal Recycling and Automotive Parts Factories | JCM (Japan) TH026 | JCM | In validation | 355 | 47 | β | JCM yearly schedule to 2030, held at the 2030 level to 2041 |
| Energy saving by installation of evaporator with mechanical vapor recompression and high-efficiency chiller. | JCM (Japan) TH021 | JCM | In validation | 0 | 0 | β | JCM yearly schedule to 2026 |
| Energy Saving by Introduction of High Efficiency Chilled Water Supply System in Milk Factory | JCM (Japan) TH019 | JCM | In validation | 0 | 0 | β | JCM yearly schedule to 2027 |
| Energy Saving for Air conditioning in Tire Manufacturing Factory with High Efficiency Centrifugal Chiller | JCM (Japan) TH007 | JCM | Registered, not yet issuing | 0 | 0 | β | JCM yearly schedule to 2027 |
| Energy Saving for Semiconductor Factory with High Efficiency Centrifugal Chiller and Compressor | JCM (Japan) TH004 | JCM | Issuing | 0 | 0 | β | JCM yearly schedule to 2025 |
| Installation of Energy-efficient Refrigerators Using Natural Refrigerant at Distribution Centre of Better Foods Co., Ltd. | JCM (Japan) TH020 | JCM | In validation | 0 | 0 | β | JCM yearly schedule to 2027 |
| Installation of High Efficiency Air Conditioning System and Chillers in Semiconductor Factory | JCM (Japan) TH003 | JCM | Issuing | 0 | 0 | β | JCM yearly schedule to 2025 |
| Introduction of 0.13MW Solar Power System to Auto Parts Factory | JCM (Japan) TH032 | JCM | In validation | 0 | 0 | β | JCM yearly schedule to 2029 |
| Introduction of 1.3MW Solar Power System to Food Factories | JCM (Japan) TH031 | JCM | In validation | 0 | 0 | β | JCM yearly schedule to 2028 |
| Introduction of 3.4MW Rooftop Solar Power System to Air-conditioning Parts Factories | JCM (Japan) TH005 | JCM | Issuing | 0 | 0 | β | JCM yearly schedule to 2027 |
| Introduction of Heat Recovery Heat Pumps to a Chicken Slaughtering Plant in Thailand | JCM (Japan) TH008 | JCM | Registered, not yet issuing | 0 | 0 | β | JCM yearly schedule to 2027 |
| Introduction of High Efficiency Ion Exchange Membrane Electrolyzer in Caustic Soda Production Plant | JCM (Japan) TH023 | JCM | In validation | 0 | 0 | β | JCM yearly schedule to 2027 |
| Introduction of High-efficiency Boiler System to Rubber Belt Plant | JCM (Japan) TH018 | JCM | In validation | 0 | 0 | β | JCM yearly schedule to 2027 |
| Introduction of Solar PV Systems on Rooftops of Factory and Office Building | JCM (Japan) TH001 | JCM | Issuing | 0 | 0 | β | JCM yearly schedule to 2020, held at the 2020 level to 2025 |
| LED lighting introduction business for the sales store. | JCM (Japan) TH025 | JCM | In validation | 0 | 0 | β | JCM yearly schedule to 2025, held at the 2025 level to 2026 |
| Reducing GHG emission at Textile Factory of Luckytex (Thailand) Public Company Limited by Upgrading to Air-saving Loom | JCM (Japan) TH002 | JCM | Issuing | 0 | 0 | β | JCM yearly schedule to 2023 |
How we estimate it
Claimed volume comes from the project description's own yearly table where we have read it, otherwise from the registry's annual estimate over the crediting period, from JCM's own yearly schedule, or, for biochar, from the rate the project has already issued at. Expected volume multiplies it by the chance of reaching issuance from the current stage (central case: pipeline 40%, in validation 60%, registered and not yet issuing 85%, issuing 100%, at risk 30%) and by the share of their claim that similar projects have delivered (dynamic-baseline nature 50%, JCM 22%, biochar 100%, other types 36%), from Berkeley Carbon Trading Project data and the JCM registry. Credits start one to three years from now depending on stage. Carbon per hectare is the yearly average of the project description's table on the area that document gives, or else the registry estimate divided by the area the proponent entered; either can be a first planting instance rather than the whole project. Project descriptions stay on the registry: follow the project link to read them. Screening estimate, updated daily; the method will change as we read more design documents.
Issued and retired
From Verra's own issuance and retirement records, every row since the registry began, as of 2026-11-23. Gold Standard not yet included.
13,939,989 credits issued11,215,172 retired80.5% of issued credits retired2,627 retirements
Who the credits were retired for
| Beneficiary, as the registry publishes it | Credits retired | Retirements | Projects | Latest |
|---|---|---|---|---|
| _ | 226,913 | 65 | 10 | 2022-04-20 |
| Yamato Transport Co., Ltd | 156,229 | 3 | 2 | 2026-09-18 |
| Chevron Petroleum Company S.A NIT 860.005.223-9 | 148,026 | 11 | 3 | 2017-10-20 |
| Terpel S.A | 125,628 | 8 | 3 | 2017-08-15 |
| 4AIR | 104,741 | 12 | 3 | 2026-09-09 |
| Qantas Airways Limited | 83,696 | 22 | 1 | 2021-06-24 |
| Organizacion Terpel identificada con NIT 830.095.213-0 | 79,968 | 7 | 2 | 2017-08-18 |
| Schweizgas Klima | 75,925 | 11 | 5 | 2023-03-02 |
| BRISBANE CITY COUNCIL | 71,700 | 6 | 2 | 2023-09-14 |
| The Boeing Company | 51,258 | 7 | 3 | 2024-02-16 |
| Germany | 50,000 | 1 | 1 | 2019-01-21 |
| USA | 50,000 | 1 | 1 | 2019-01-21 |
| KPMG Australia | 39,814 | 1 | 1 | 2020-06-11 |
| LifeGate Climate Action per PostePay | 38,000 | 1 | 1 | 2024-11-19 |
| On Behalf of McKinsey & Co.'s 2022 GHG Emissions | 38,000 | 4 | 2 | 2022-12-05 |
| Other named beneficiaries | 1,034,683 | |||
| No public beneficiary | 8,840,591 |
Names are the registry's beneficial-owner field where the registry marks it public. Beneficiaries under 1,000 credits are not named here.
By vintage
| Vintage | Issued | Retired | issued retired |
|---|---|---|---|
| 2004 | 1,871 | 1,871 | |
| 2005 | 8,012 | 8,012 | |
| 2006 | 649,298 | 597,194 | |
| 2007 | 1,116,476 | 1,028,238 | |
| 2008 | 1,136,207 | 1,089,263 | |
| 2009 | 1,022,167 | 1,018,941 | |
| 2010 | 876,441 | 860,623 | |
| 2011 | 665,244 | 590,981 | |
| 2012 | 845,893 | 747,387 | |
| 2013 | 724,550 | 590,506 | |
| 2014 | 708,678 | 641,408 | |
| 2015 | 606,847 | 581,243 | |
| 2016 | 505,072 | 488,555 | |
| 2017 | 409,062 | 389,015 | |
| 2018 | 411,159 | 404,534 | |
| 2019 | 1,189,033 | 1,032,211 | |
| 2020 | 1,008,652 | 626,967 | |
| 2021 | 999,246 | 324,715 | |
| 2022 | 745,089 | 168,892 | |
| 2023 | 268,541 | 24,616 | |
| 2024 | 42,451 | 0 |
By year
| Year | Issued that year | Retired that year |
|---|---|---|
| 2009 | 307,830 | 90,153 |
| 2010 | 1,025,584 | 577,400 |
| 2011 | 1,837,550 | 568,568 |
| 2012 | 1,496,795 | 605,566 |
| 2013 | 462,908 | 1,406,007 |
| 2014 | 52,961 | 406,842 |
| 2015 | 49,628 | 742,291 |
| 2016 | 252,186 | 404,205 |
| 2017 | 939,879 | 845,789 |
| 2018 | 843,840 | 720,675 |
| 2019 | 914,687 | 880,333 |
| 2020 | 1,402,276 | 716,226 |
| 2021 | 1,676,126 | 1,214,008 |
| 2022 | 1,087,130 | 769,149 |
| 2023 | 774,707 | 451,648 |
| 2024 | 322,445 | 312,999 |
| 2025 | 197,791 | 149,936 |
| 2026 | 295,666 | 353,377 |
By project
Every project
* already listed when we started reading that registry daily; the listing date is earlier.