LatestCountriesDevelopersSearch

Countries › Tanzania

🇹🇿 Carbon projects in Tanzania

100 listed today1 delistedData as of 2026-11-23

Covered by the East Africa edition of the Carbon.Supply briefing.

Expected supply: biochar, dynamic-baseline nature and JCM

Carbon.Supply screening estimate, not a registry figure and not a forecast of prices. What these projects claim, discounted by how far each has got and by how much similar projects have delivered before. How we estimate it.

910k claimed for 2030263k expected in 2030range 136k to 566k

0 227k 455k 682k 910k 2028: 241,696 expected 2029: 262,565 expected 2030: 262,565 expected 2031: 262,565 expected 2032: 262,565 expected 2033: 262,565 expected 2034: 262,565 expected 2035: 262,565 expected 2036: 262,565 expected 2037: 262,565 expected 2038: 262,565 expected 2039: 262,565 expected 2040: 262,565 expected 2041: 262,565 expected 2042: 262,565 expected 2043: 262,565 expected 2044: 262,565 expected 2045: 262,565 expected 2046: 262,565 expected 2047: 262,565 expected 2048: 262,565 expected 2049: 262,565 expected 2050: 262,565 expected 2030 2035 2040 2045 2050
Biochar   Dynamic-baseline nature   claimed (dotted) · tCO2e a year, central case
GroupProjectsClaimed 2030Expected 2030Range 2030Claimed 2026–2050Expected 2026–2050
Biochar2 (2 without a claim)000–000
Dynamic-baseline nature6909,996262,565136,020–565,70322,749,9006,018,126
All other types9012,641,9023,190,3011,498,333–6,434,906161,386,78634,371,024

Focus projects

ProjectRegistryGroupStageClaimed 2030Expected 2030t CO2e per ha a yearBasis of the claim
KFL - atmosfair Mafia Island biocharIsometric prj_1KA8WSNN61S09FHSBiocharIn validation–––no credits issued yet, so no run rate
Sifuri Halisi TZ001-BIsometric prj_1K6G4S1PJ1S0TR4ZBiocharIn validation–––no credits issued yet, so no run rate
Acorn - Kaderes Smallholder Agroforestry in TanzaniaVerra VCS 5760Dynamic-baseline natureIn validation476,494142,9485.3registry estimate 476,494 a year, 2020 to 2050
Tausi TanzaniaVerra VCS 5806Dynamic-baseline natureIn validation266,19679,8596.8registry estimate 266,196 a year, 2023 to 2063
One Acre Fund Tanzania Agroforestry ProgramVerra VCS 5384Dynamic-baseline natureIn validation62,96518,8901.8registry estimate 62,965 a year, 2022 to 2051
Suledo Community ARR Project (Mradi wa jamii wa Suledo wa Hewa kaboni)Verra VCS 5802Dynamic-baseline naturePipeline62,40612,4816.2registry estimate 62,406 a year, 2025 to 2065
TanzaBlueVerra VCS 5457Dynamic-baseline naturePipeline31,6676,3336.3registry estimate 31,667 a year, 2025 to 2085
Zanzibar Community Restoration ProjectVerra VCS 6230Dynamic-baseline naturePipeline10,2682,0543.1registry estimate 10,268 a year, 2025 to 2065
How we estimate it

Claimed volume comes from the project description's own yearly table where we have read it, otherwise from the registry's annual estimate over the crediting period, from JCM's own yearly schedule, or, for biochar, from the rate the project has already issued at. Expected volume multiplies it by the chance of reaching issuance from the current stage (central case: pipeline 40%, in validation 60%, registered and not yet issuing 85%, issuing 100%, at risk 30%) and by the share of their claim that similar projects have delivered (dynamic-baseline nature 50%, JCM 22%, biochar 100%, other types 36%), from Berkeley Carbon Trading Project data and the JCM registry. Credits start one to three years from now depending on stage. Carbon per hectare is the yearly average of the project description's table on the area that document gives, or else the registry estimate divided by the area the proponent entered; either can be a first planting instance rather than the whole project. Project descriptions stay on the registry: follow the project link to read them. Screening estimate, updated daily; the method will change as we read more design documents.

Issued and retired

From Verra's own issuance and retirement records, every row since the registry began, as of 2026-11-23. Gold Standard not yet included.

10,911,111 credits issued5,322,245 retired48.8% of issued credits retired1,123 retirements

Who the credits were retired for

Beneficiary, as the registry publishes itCredits retiredRetirementsProjectsLatest
Eni Upstream3,084,0314222026-02-24
AUDI AG362,642812023-12-06
Marke VW Pkw200,000712022-12-14
Josera petfood GmbH & Co. KG150,310412026-06-04
Etihad Airways PJSC80,000312021-02-17
British Sky Broadcasting Limited62,599112010-09-24
Foodforplanet GmbH & Co. KG60,200412026-06-04
Eni Plenitude France SAS58,949212026-06-18
Klima57,2006612025-03-05
Clients of Eni Gas & Power France who are subscribed to “CO2-compensated gas offers & options” till 30-09-202354,313112024-02-28
Howden Group Holdings30,000222024-01-18
Josera Erbacher Service GmbH & Co. KG27,497412026-06-04
Howden Group Services Limited26,000112022-07-19
Blue Bottle Coffee25,173212025-10-10
Eni Plenitude SpA Società Benefit16,832112026-02-25
Other named beneficiaries217,193
No public beneficiary809,306

Names are the registry's beneficial-owner field where the registry marks it public. Beneficiaries under 1,000 credits are not named here.

By vintage

VintageIssuedRetiredissued retired
2002139,358139,358
200822,79022,790
201125,2004,408
201295,90985,091
2013532,089495,501
20161,5161,425
2017544,611538,842
2018890,368844,184
2019980,538914,426
2020901,766901,494
2021530,002409,375
20221,468,827614,778
20231,882,036301,259
20241,539,43949,314
2025960,9540
2026395,7080

By year

YearIssued that yearRetired that year
2010139,35863,599
2012021,504
201322,79071,232
201459,7385,065
2015028,166
201635,2001,428
201704,715
201807,441
201903,306
2020271,4257,091
20211,497,089196,763
20221,752,2451,966,517
20231,893,402566,009
2024518,441913,916
2025613,855657,655
20264,107,568807,838

By project

Every project

ProjectRegistryCountryRegistry statusCarbon.Supply classificationFirst seen
African Biogas Carbon Programme (ABC) - Tanzania - CAMARTEC - VPA002Gold Standard 1645TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
African Biogas Carbon Programme (ABC) - Tanzania – CAMARTEC - VPA004Gold Standard 1647TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
African Biogas Carbon Programme (ABC) – Tanzania – SimGas - VPA005Gold Standard 1648TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Arusha Improved Cookstoves ProjectGold Standard 41TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Beyond Biomass: UpEnergy Electric Cooking-VPA 9Gold Standard 4265TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Building Climate Resilience through Agroforestry Practices in TanzaniaGold Standard 5376TanzaniaLISTEDPipeline2026-09-20*
CCT Clean Cooking Project, TanzaniaGold Standard 5389TanzaniaLISTEDPipeline2026-09-20*
Clean Cooking for Communities in KigomaGold Standard 4664TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Clean Cooking in Tanzania: Pay-As-You-Go Smart Metering SolutionGold Standard 4844TanzaniaLISTEDPipeline2026-09-20*
Clean Cooking to Combat Climate Change in TanzaniaGold Standard 3642TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Clean cooking: Fuel switching to avoid deforestationGold Standard 4486TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Clean Cookstoves and Biofuel Solutions in TanzaniaGold Standard 5084TanzaniaLISTEDPipeline2026-09-20*
Composting Facilities for Organic Waste in East AfricaGold Standard 4747TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Composting Facilities for Organic Waste in Tanzania – VPA1Gold Standard 4744TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Dissemination of fuel efficient biomass stoves and water purification systems in TanzaniaGold Standard 1224TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Green Tanzania Cookstove ProgrammeGold Standard 4111TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS 10963 VPA 50 – UpEnergy – Social and Climate Impact Programme – Cooking DevicesGold Standard 5311TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS 10963 VPA 51 – UpEnergy – Social and Climate Impact Programme – Cooking DevicesGold Standard 5312TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS 10963 VPA 52 – UpEnergy – Social and Climate Impact Programme – Cooking DevicesGold Standard 5313TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS 10963 VPA 53 – UpEnergy – Social and Climate Impact Programme – Cooking DevicesGold Standard 5314TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS 12030 VPA 1 Safe Water Project in Kigoma and Dodoma (Tanzania)Gold Standard 4195TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS 23272 VPA-1 Clean Cookstoves and Biofuel Solutions in Tanzania- Pwani RegionGold Standard 5085TanzaniaLISTEDPipeline2026-09-20*
GS PoA Safe Water Programme by Water Mission in TanzaniaGold Standard 4194TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS10789 GS 10790 RVPA 47: Efficient and Clean Cooking for households in TanzaniaGold Standard 3690TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS10789 GS 10790 VPA42: Efficient and Clean Cooking for households in TanzaniaGold Standard 3689TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS10789 GS10790 RVPA-43 Efficient and Clean Cooking for households in TanzaniaGold Standard 4397TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS10789 GS10790 RVPA-44: Efficient and Clean Cooking for households in TanzaniaGold Standard 4429TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS12102 GS12458 RVPA-1 Carbon Credit financing for sustainable rural water supply in Manyara RegionGold Standard 5044TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS12102 GS12458 RVPA-2 Carbon Credit financing for sustainable rural water supply in Manyara RegionGold Standard 5046TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS12102 GS12458 RVPA-3 Carbon Credit financing for sustainable rural water supply in Manyara RegionGold Standard 5045TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS12102 VPA-1 Carbon Credit financing for sustainable rural water supply in Manyara RegionGold Standard 4340TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS12118 Project the Environment, Use Clean Cookstoves VPA-1Gold Standard 4110TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS12118-GS12138 RVPA-3 Improve the Environment, Use Clean CookstovesGold Standard 5441TanzaniaLISTEDPipeline2026-09-30
GS12443 GS12490 RVPA-12: ECC_Multi-country Electric Clean Cooking Programme in TanzaniaGold Standard 4553TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS12443 VPA 11: ECC_Multi-country Electric Clean Cooking Programme in TanzaniaGold Standard 4488TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS12591 VPA-1 Clean cooking: LPG to avoid deforestation in Mlimba districtGold Standard 4487TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
GS12877 VPA 1- eWATER Emission Reductions from Safe Drinking Water Supply and Accreditation of Water Benefit Certificates - Real case VPA TanzaniaGold Standard 4609TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS12980-GS12981-OYU - Clean Water for Future LeadersGold Standard 5582TanzaniaLISTEDPipeline2026-09-20*
GS13086 GS13087 RVPA1Oyu - Fuelling a Brighter Future in TanzaniaGold Standard 5580TanzaniaLISTEDPipeline2026-09-20*
GS23449 VPA-1 Building Climate Resilience through Agroforestry Practices in TanzaniaGold Standard 5377TanzaniaLISTEDPipeline2026-09-20*
GS23548-VPA-2 d.light Clean Energy Access Programme-TanzaniaGold Standard 5493TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS2527 - Mobisol Solar Home Systems in Tanzania – VPA 1Gold Standard 1327TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS4503 - Sustainable Safe Water Program-Tulip Filters in Tanzania VPA 1Gold Standard 531TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
GS5304 MKOPA Solar Lighting Programme of Activities – Tanzania VPA 3Gold Standard 1367TanzaniaLISTEDPipeline2026-09-20*
GS7591 VPA 66 Innovation: Africa Solar Water Pumping Projects - TanzaniaGold Standard 4472TanzaniaLISTEDPipeline2026-09-20*
Healthy Kitchens and Happy Lives in Tanzania-VPA01Gold Standard 5242TanzaniaLISTEDPipeline2026-09-20*
Idea Balance Safe Water Access ProjectGold Standard 5217TanzaniaLISTEDPipeline2026-09-20*
Increased and improved access to safe drinking water in developing countriesGold Standard 2673TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Mabwepande Composting Facility for Market WasteGold Standard 1690TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Mobisol Solar Home Systems Micro-Scale PoAGold Standard 1326TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
OYU - Clean Water for Future LeadersGold Standard 4633TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
OYU - Clean Water for Future Leaders VPA01Gold Standard 4634TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
OYU – Fuelling a Brighter Future in TanzaniaGold Standard 4738TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
OYU – Fuelling a Brighter Future in Tanzania VPA01Gold Standard 4742TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
Rehabilitation and Extension of Itete Hospital Hydropower StationGold Standard 187TanzaniaLISTEDPipeline2026-09-20*
Renewable Power Generation on Mafia IslandGold Standard 3273TanzaniaLISTEDPipeline2026-09-20*
Safe drinking water projectGold Standard 3907TanzaniaLISTEDPipeline2026-09-20*
Safe Water Purifier Project in Tanzania NorthernGold Standard 3983TanzaniaLISTEDPipeline2026-09-20*
Safe Water Purifier Project in Tanzania WesternGold Standard 3984TanzaniaLISTEDPipeline2026-09-20*
Solar Electric Cooking Systems for Schools and Other Institutions in TanzaniaGold Standard 5559TanzaniaLISTEDPipeline2026-09-20*
Sustainable Safe Water ProgrammeGold Standard 795TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Sustainable Water Purification ProgrammeGold Standard 3432TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Tanga Improved Cook Stove ProjectGold Standard 40TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Tanzania Jiko Pamoja Improved Cookstove ProjectGold Standard 4848TanzaniaLISTEDPipeline2026-09-20*
TDV Safe Water Supply Project – TanzaniaGold Standard 5610TanzaniaLISTEDPipeline2026-09-20*
Unite to Light & Solar Sister Solar Lamp Project - Tanzania 2023Gold Standard 3995TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
UpEnergy -Social and Climate Impact Programme -Safe Water Drinking Programme- VPA 39Gold Standard 4581TanzaniaLISTEDPipeline2026-09-20*
UpEnergy-Social and Climate Impact Programme- Cooking Devices VPA-14Gold Standard 3344TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
VPA 1: The MomCare ProjectGold Standard 3433TanzaniaGOLD_STANDARD_CERTIFIED_DESIGNRegistered2026-09-20*
Zaidi Bomba Maji ArushaGold Standard 2676TanzaniaGOLD_STANDARD_CERTIFIED_PROJECTRegistered2026-09-20*
KFL - atmosfair Mafia Island biocharIsometric prj_1KA8WSNN61S09FHSTanzaniaUNDER_VALIDATIONIn validation2026-09-21*
Sifuri Halisi TZ001-BIsometric prj_1K6G4S1PJ1S0TR4ZTanzaniaUNDER_VALIDATIONIn validation2026-09-21*
Acorn - Kaderes Smallholder Agroforestry in TanzaniaVerra VCS 5760TanzaniaUnder validation (Public comment period closed)In validation2026-09-20*
BLACK SOLDIER FLY COMMERCIAL FARMING PROJECTVerra VCS 4145TanzaniaRegisteredRegistered2026-09-20*
Community Carbon Efficient Cooking Programme - Tanzania-1Verra VCS 2676TanzaniaVerification approval requestedRegistered2026-09-20*
Distribution of Fuel Efficient Improved Cookstoves in TanzaniaVerra VCS 4385TanzaniaUnder validation (Public comment period closed)In validation2026-09-20*
ENJIPAI COMMUNITY RANGELAND CARBON PROJECTVerra VCS 4742TanzaniaUnder validation (Public comment period closed)In validation2026-09-20*
HIMA (Hifadhi ya Misitu ya Asili ya jamii) REDD+ ProgramVerra VCS 1381TanzaniaPipeline Listing (under development) approvedPipeline2026-09-20*
Igombe REDD+ ProjectVerra VCS 5679TanzaniaPipeline Listing (under development) approvedPipeline2026-09-20*
Improved Cookstove Initiative in Karatu District, TanzaniaVerra VCS 5692TanzaniaUnder validation (Public comment period closed)In validation2026-09-20*
Installation of high efficiency wood burning cookstoves in TanzaniaVerra VCS 2366TanzaniaRegisteredRegistered2026-09-20*
Installation of high efficiency wood burning cookstoves in Tanzania - Project 3Verra VCS 4157TanzaniaWithdrawnInactive2026-09-20*
Installation of high efficiency wood burning cookstoves in Tanzania 2Verra VCS 3209TanzaniaRegisteredRegistered2026-09-20*
Landfill gas recovery and electricity generation at “Mtoni Dumpsite”, Dar Es Salaam, Tanzania - CER ConversionVerra VCS 1564TanzaniaUnits transferred from approved GHG programRegistered2026-09-20*
Longido and Monduli Rangelands Carbon ProjectVerra VCS 4924TanzaniaUnder validation (Public comment period closed)In validation2026-09-20*
Makame Savannah REDDVerra VCS 1900TanzaniaRegisteredRegistered2026-09-20*
Mwenga Hydro Power ProjectVerra VCS 5822TanzaniaUnder validation (Public comment period closed)In validation2026-09-20*
Ntakata Mountains REDDVerra VCS 1897TanzaniaRegisteredRegistered2026-09-20*
One Acre Fund Tanzania Agroforestry ProgramVerra VCS 5384TanzaniaUnder validation (Public comment period closed)In validation2026-09-20*
Reforestation of degraded grasslands in Uchindile & Mapanda, TanzaniaVerra VCS 142TanzaniaLate to VerifyAt risk2026-09-20*
Renewable Electricity Grouped Project in AfricaVerra VCS 2571TanzaniaRegisteredRegistered2026-09-20*
Ruvuma Wilderness ProjectVerra VCS 4838TanzaniaPipeline Listing (under development) approvedPipeline2026-09-20*
Suledo Community ARR Project (Mradi wa jamii wa Suledo wa Hewa kaboni)Verra VCS 5802TanzaniaPipeline Listing (under development) approvedPipeline2026-09-20*
TanzaBlueVerra VCS 5457TanzaniaPipeline Listing (under development) approvedPipeline2026-09-20*
Tausi TanzaniaVerra VCS 5806TanzaniaUnder validation (Public comment period closed)In validation2026-09-20*
The Rubeho Mountains Carbon ProjectVerra VCS 5282TanzaniaInactiveInactive2026-09-20*
TIST Program in Tanzania, VCS-CCB-011Verra VCS 4881TanzaniaRegistration requestedIn validation2026-09-20*
Udzungwa Corridor ReforestationVerra VCS 3602TanzaniaRegisteredRegistered2026-09-20*
Village Climate SolutionsVerra VCS 1325TanzaniaRegisteredRegistered2026-09-20*
Zanzibar Community Restoration ProjectVerra VCS 6230TanzaniaPipeline listing requested (under development)Pipeline2026-10-02
Sagera Sisal Biochar projectVerra VCS 5916TanzaniaPipeline listing requested (under development) delistedPipeline2026-09-20*

* already listed when we started reading that registry daily; the listing date is earlier.