Countries › Indonesia
🇮🇩 Carbon projects in Indonesia
157 listed todayData as of 2026-11-23
Read the Indonesia market guide → Policy, buyers and what to watch. This page is the full project list behind it.
Covered by the Southeast Asia edition of the Carbon.Supply briefing.
Expected supply: biochar, dynamic-baseline nature and JCM
Carbon.Supply screening estimate, not a registry figure and not a forecast of prices. What these projects claim, discounted by how far each has got and by how much similar projects have delivered before. How we estimate it.
13.4M claimed for 20303.5M expected in 2030range 1.7M to 7.6M
| Group | Projects | Claimed 2030 | Expected 2030 | Range 2030 | Claimed 2026–2050 | Expected 2026–2050 |
|---|---|---|---|---|---|---|
| Dynamic-baseline nature | 18 | 13,286,239 | 3,443,764 | 1,719,654–7,615,868 | 329,786,561 | 77,012,473 |
| JCM | 39 | 75,545 | 12,797 | 5,932–28,264 | 1,372,161 | 217,302 |
| All other types | 94 | 46,175,544 | 10,508,019 | 4,797,372–21,764,301 | 911,024,149 | 212,408,633 |
Focus projects
| Project | Registry | Group | Stage | Claimed 2030 | Expected 2030 | t CO2e per ha a year | Basis of the claim |
|---|---|---|---|---|---|---|---|
| Tanimbar Community Forest Restoration Project | Verra VCS 5796 | Dynamic-baseline nature | In validation | 2,568,258 | 770,477 | 46.7 | registry estimate 2,568,258 a year, 2025 to 2065 |
| Delta Kapuas Project | Verra VCS 5834 | Dynamic-baseline nature | Pipeline | 2,438,716 | 487,743 | 20.0 | registry estimate 2,438,716 a year, 2023 to 2086 |
| Seruyan Ecosystem Restoration Project | Verra VCS 6254 | Dynamic-baseline nature | In validation | 1,928,759 | 578,628 | 60.9 | registry estimate 1,928,759 a year, 2025 to 2114 |
| Enviro Rise | Verra VCS 5631 | Dynamic-baseline nature | Pipeline | 1,316,941 | 263,388 | 38.5 | registry estimate 1,316,941 a year, 2024 to 2063 |
| Kupu-Kupu Project - Enhancing Livelihoods through Mangrove Restoration and Silvofishery in South Sulawesi | Verra VCS 5032 | Dynamic-baseline nature | Pipeline | 1,045,496 | 209,099 | 15.7 | registry estimate 1,045,496 a year, 2024 to 2064 |
| WEST SERAM REDD+ and AGARWOOD ForestWise PROJECT | Verra VCS 4381 | Dynamic-baseline nature | In validation | 1,005,710 | 301,713 | 26.6 | registry estimate 1,005,710 a year, 2025 to 2055 |
| The Pekanbaru Suntara Peatland Project (PSPP) | Verra VCS 5520 | Dynamic-baseline nature | In validation | 665,596 | 199,679 | 18.7 | registry estimate 665,596 a year, 2024 to 2063 |
| WEST NUSA TENGGARA ISLANDS AGROFORESTRY PROJECT | Verra VCS 6277 | Dynamic-baseline nature | Pipeline | 457,804 | 91,561 | 30.5 | registry estimate 457,804 a year, 2024 to 2063 |
| Gunung Mas Community Forest Restoration Project | Verra VCS 5905 | Dynamic-baseline nature | In validation | 445,244 | 133,573 | 10.1 | registry estimate 445,244 a year, 2026 to 2065 |
| Hutani Berkah Mulia | Verra VCS 5534 | Dynamic-baseline nature | Pipeline | 372,663 | 74,533 | 36.7 | registry estimate 372,663 a year, 2023 to 2082 |
| Nunukan Mangrove & Peatland Project | Verra VCS 5845 | Dynamic-baseline nature | In validation | 355,275 | 106,582 | 22.8 | registry estimate 355,275 a year, 2026 to 2066 |
| Sanggala Corridor Project | Verra VCS 5458 | Dynamic-baseline nature | In validation | 177,514 | 53,254 | 10.9 | registry estimate 177,514 a year, 2023 to 2073 |
| Forest Landscape Restoration in North Sulawesi Province | Verra VCS 5891 | Dynamic-baseline nature | In validation | 158,764 | 47,629 | 26.5 | registry estimate 158,764 a year, 2025 to 2064 |
| Mangrove restoration and coastal greenbelt protection in the East coast of Aceh and North Sumatra Province, Indonesia | Verra VCS 1493 | Dynamic-baseline nature | Issuing | 124,706 | 62,353 | 124.7 | registry estimate 124,706 a year, 2011 to 2031 |
| BLUERIZON PROJECT: BLUE CARBON PROJECT ON TIDAL WETLAND OF MANGROVES IN JAVA-1, INDONESIA | Verra VCS 5448 | Dynamic-baseline nature | In validation | 101,974 | 30,592 | 30.7 | registry estimate 101,974 a year, 2026 to 2055 |
| Kapuas Pisau Conservation Project | Verra VCS 5736 | Dynamic-baseline nature | In validation | 83,123 | 24,937 | 6.1 | registry estimate 83,123 a year, 2023 to 2053 |
| YAKOPI Mangrove Restoration Project | Verra VCS 5545 | Dynamic-baseline nature | Pipeline | 38,870 | 7,774 | 35.3 | registry estimate 38,870 a year, 2022 to 2062 |
| CARBON AGROFORESTRY IN CIMANUK, PROGO AND BRANTAS WATERSHED - INDONESIA | Verra VCS 5620 | Dynamic-baseline nature | In validation | 826 | 248 | 10.6 | registry estimate 826 a year, 2023 to 2123 |
| 10MW Mini Hydro Power Plant Project in North Sumatra | JCM (Japan) ID027 | JCM | Registered, not yet issuing | 32,807 | 6,135 | – | JCM yearly schedule to 2030, held at the 2030 level to 2041 |
| 6MW Mini Hydro Power Plant Project in West Pasaman, West Sumatra | JCM (Japan) ID037 | JCM | In validation | 18,474 | 2,439 | – | JCM yearly schedule to 2030, held at the 2030 level to 2044 |
| Energy Saving by Introducing High Efficiency Autoclave to Infusion Manufacturing Factory 2 | JCM (Japan) ID034 | JCM | Registered, not yet issuing | 9,330 | 1,745 | – | JCM yearly schedule to 2030, held at the 2030 level to 2031 |
| Rehabilitation Project of Power Generation System at Karai 7 Mini Hydro Power Plant | JCM (Japan) ID035 | JCM | Registered, not yet issuing | 3,849 | 720 | – | JCM yearly schedule to 2030, held at the 2030 level to 2044 |
| 4.2MW Rooftop Solar Power Project to Pharmaceutical Factories, Vehicles Dealers, and Timber Factories | JCM (Japan) ID033 | JCM | Registered, not yet issuing | 3,820 | 714 | – | JCM yearly schedule to 2030, held at the 2030 level to 2039 |
| Introduction of 3.1MW Rooftop Solar Power System to Fast-Moving Consumer Goods and Printing Factories in Java Island | JCM (Japan) ID039 | JCM | In validation | 2,671 | 353 | – | JCM yearly schedule to 2030, held at the 2030 level to 2033 |
| Introduction of 2.1MW Rooftop Solar Power System in Woodworking Factories | JCM (Japan) ID036 | JCM | In validation | 1,565 | 207 | – | JCM yearly schedule to 2030, held at the 2030 level to 2034 |
| Introduction of High-efficiency Once-through Boiler System to Chemical Factory | JCM (Japan) ID038 | JCM | In validation | 1,411 | 186 | – | JCM yearly schedule to 2030 |
| 1.6MW Solar PV Power Plant Project in Jakabaring Sport City | JCM (Japan) ID018 | JCM | Registered, not yet issuing | 917 | 171 | – | JCM yearly schedule to 2030, held at the 2030 level to 2034 |
| Energy Saving for Air-Conditioning at Shopping Mall with High Efficiency Centrifugal Chiller | JCM (Japan) ID009 | JCM | Issuing | 398 | 88 | – | JCM yearly schedule to 2020, held at the 2020 level to 2030 |
| Installation of Aerator for Industrial Wastewater Treatment Facility in Rubber Factory | JCM (Japan) ID031 | JCM | In validation | 303 | 40 | – | JCM yearly schedule to 2030, held at the 2030 level to 2037 |
| Energy Saving by Introducing High Efficiency Autoclave to Infusion Manufacturing Factory | JCM (Japan) ID029 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2027 |
| Energy saving by optimum operation at an oil refinery | JCM (Japan) ID014 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2022 |
| Energy Saving for Air-Conditioning and Process Cooling by Introducing High-efficiency Centrifugal Chiller | JCM (Japan) ID001 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020 |
| Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Batang, Central Java (Phase 2) | JCM (Japan) ID005 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2021 |
| Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Karawang West Java | JCM (Japan) ID004 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020 |
| Energy Saving for Industrial Park with Smart LED Street Lighting System | JCM (Japan) ID025 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2025 |
| Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia | JCM (Japan) ID010 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2021, held at the 2021 level to 2023 |
| GHG emission reductions through utility facility operation optimization system for refineries in the Republic of Indonesia | JCM (Japan) ID012 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2022 |
| Installation of all-electric injection molding machine with power regeneration to plastics & packaging manufacturing plants | JCM (Japan) ID030 | JCM | In validation | 0 | 0 | – | JCM yearly schedule to 2028 |
| Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia | JCM (Japan) ID019 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2026 |
| Installation of Inverter-type Air Conditioning System, LED Lighting and Separate Type Fridge Freezer Showcase to Grocery Stores in Republic of Indonesia | JCM (Japan) ID006 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2021 |
| Installation of Solar Power System and Storage Battery to Commercial Facility | JCM (Japan) ID023 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2030 |
| Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia | JCM (Japan) ID016 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2027 |
| Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2 | JCM (Japan) ID008 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2023 |
| Introduction of 0.5MW Solar Power System to Aroma and Food Ingredients Factory | JCM (Japan) ID017 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2028 |
| Introduction of Absorption Chiller to Chemical Factory | JCM (Japan) ID024 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2027 |
| Introduction of CNG-Diesel Hybrid Equipment to Public Bus in Semarang | JCM (Japan) ID032 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2024 |
| Introduction of Gas Co-generation System and Absorption Chiller to Motor Parts Factory | JCM (Japan) ID028 | JCM | In validation | 0 | 0 | – | JCM yearly schedule to 2028 |
| Introduction of Gas Co-generation System and Absorption Chiller to Motor Parts Factory | JCM (Japan) ID040 | JCM | In validation | 0 | 0 | – | JCM yearly schedule to 2028 |
| Introduction of High Efficiency Once-through Boiler in Golf Ball Factory | JCM (Japan) ID022 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2025 |
| Introduction of High-Efficiency Looms in Weaving Mill | JCM (Japan) ID020 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2025 |
| Introduction of High-efficiency Once-through Boiler in Film Factory | JCM (Japan) ID021 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2025 |
| Introduction of LED Lighting to UNIQLO Sales Stores | JCM (Japan) ID026 | JCM | Registered, not yet issuing | 0 | 0 | – | JCM yearly schedule to 2025 |
| Power generation by waste heat recovery in the PT Semen Indonesia (Persero) Tbk factory in Tuban | JCM (Japan) ID013 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2026 |
| Project of Introducing High Efficiency Refrigerator to a Food Industry Cold Storage in Indonesia | JCM (Japan) ID002 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2025 |
| Project of Introducing High Efficiency Refrigerator to a Frozen Food Processing Plant in Indonesia | JCM (Japan) ID003 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2025 |
| Reducing GHG emission at textile factories by upgrading to air-saving loom | JCM (Japan) ID015 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2023 |
| Reduction of Energy Consumption by Introducing an Energy-Efficient Waste Paper Processing System into a Packaging Paper Factory in Bekasi, West Java | JCM (Japan) ID011 | JCM | Issuing | 0 | 0 | – | JCM yearly schedule to 2020, held at the 2020 level to 2028 |
How we estimate it
Claimed volume comes from the project description's own yearly table where we have read it, otherwise from the registry's annual estimate over the crediting period, from JCM's own yearly schedule, or, for biochar, from the rate the project has already issued at. Expected volume multiplies it by the chance of reaching issuance from the current stage (central case: pipeline 40%, in validation 60%, registered and not yet issuing 85%, issuing 100%, at risk 30%) and by the share of their claim that similar projects have delivered (dynamic-baseline nature 50%, JCM 22%, biochar 100%, other types 36%), from Berkeley Carbon Trading Project data and the JCM registry. Credits start one to three years from now depending on stage. Carbon per hectare is the yearly average of the project description's table on the area that document gives, or else the registry estimate divided by the area the proponent entered; either can be a first planting instance rather than the whole project. Project descriptions stay on the registry: follow the project link to read them. Screening estimate, updated daily; the method will change as we read more design documents.
Issued and retired
From Verra's own issuance and retirement records, every row since the registry began, as of 2026-11-23. Gold Standard not yet included.
102,078,105 credits issued80,785,872 retired79.1% of issued credits retired18,156 retirements
Who the credits were retired for
| Beneficiary, as the registry publishes it | Credits retired | Retirements | Projects | Latest |
|---|---|---|---|---|
| Shell | 11,933,799 | 122 | 1 | 2026-02-09 |
| PetroChina International Company Limited (“PCI”) | 3,055,511 | 45 | 1 | 2025-12-15 |
| AUDI AG | 2,540,874 | 10 | 2 | 2021-11-08 |
| CPC CORPORATION, TAIWAN | 1,633,374 | 12 | 1 | 2025-01-17 |
| Volkswagen Marke Pkw | 1,420,171 | 8 | 2 | 2021-12-16 |
| Delta Air Lines | 1,250,000 | 3 | 2 | 2021-06-30 |
| Chanel | 1,130,000 | 6 | 1 | 2022-06-01 |
| Woodside Burrup Pty Ltd | 1,105,418 | 8 | 1 | 2024-12-13 |
| VistaJet Ltd | 1,014,822 | 31 | 2 | 2026-04-28 |
| DL | 1,000,000 | 1 | 1 | 2021-09-28 |
| Allianz SE | 910,465 | 7 | 1 | 2021-02-05 |
| VistaJet | 861,643 | 34 | 3 | 2025-03-26 |
| PRIMAKLIMA e.V | 589,189 | 118 | 2 | 2023-08-30 |
| Volkswagen Brand Passenger Cars | 550,000 | 2 | 1 | 2020-10-29 |
| EY Global Services Limited | 474,000 | 33 | 2 | 2025-10-13 |
| Other named beneficiaries | 19,559,923 | |||
| No public beneficiary | 31,756,683 |
Names are the registry's beneficial-owner field where the registry marks it public. Beneficiaries under 1,000 credits are not named here.
By vintage
| Vintage | Issued | Retired | issued retired |
|---|---|---|---|
| 2006 | 435,966 | 435,643 | |
| 2007 | 163,770 | 162,970 | |
| 2008 | 119,287 | 118,037 | |
| 2009 | 3,343,478 | 3,144,533 | |
| 2010 | 16,208,684 | 15,613,731 | |
| 2011 | 3,851,511 | 2,956,022 | |
| 2012 | 4,283,197 | 3,463,388 | |
| 2013 | 4,970,697 | 3,965,697 | |
| 2014 | 5,269,230 | 4,292,256 | |
| 2015 | 9,538,677 | 8,331,139 | |
| 2016 | 4,950,623 | 3,335,142 | |
| 2017 | 10,512,025 | 8,403,181 | |
| 2018 | 10,362,061 | 9,972,086 | |
| 2019 | 8,998,995 | 8,461,933 | |
| 2020 | 8,057,278 | 7,785,071 | |
| 2021 | 2,894,626 | 300,349 | |
| 2022 | 2,400,000 | 27,057 | |
| 2023 | 5,718,000 | 17,637 |
By year
| Year | Issued that year | Retired that year |
|---|---|---|
| 2009 | 112,500 | 2,500 |
| 2010 | 296,938 | 93,259 |
| 2011 | 1,067,035 | 424,724 |
| 2012 | 564,418 | 193,783 |
| 2013 | 5,862,027 | 272,510 |
| 2014 | 2,002,860 | 2,597,141 |
| 2015 | 1,842,642 | 2,040,310 |
| 2016 | 1,203,713 | 1,613,992 |
| 2017 | 3,124,841 | 1,987,733 |
| 2018 | 12,448,090 | 1,701,460 |
| 2019 | 16,127,061 | 3,028,594 |
| 2020 | 6,034,669 | 5,448,357 |
| 2021 | 25,440,142 | 15,770,158 |
| 2022 | 11,769,444 | 8,575,479 |
| 2023 | 1,448,593 | 13,981,493 |
| 2024 | 449,068 | 11,894,873 |
| 2025 | 860,329 | 8,807,806 |
| 2026 | 11,423,735 | 2,351,700 |
By project
Every project
| Project | Registry | Country | Registry status | Carbon.Supply classification | First seen |
|---|---|---|---|---|---|
| *Salido Kecil Mini Hydropower Plant | Gold Standard 716 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| 42 MWp Bundled Solar Photovoltaic Power project in Indonesia | Gold Standard 2055 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| 72 MW Wind power project in the South Sulawesi Province of Indonesia | Gold Standard 1789 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Brine Heat Recovery Binary Power Plant | Gold Standard 3747 | Indonesia | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| CPA B11001 – Bagendung Landfill Gas Recovery | Gold Standard 98 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| Ecological landscape resilience in Sumatra´s highlands | Gold Standard 4989 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| Gianyar Waste Recovery Project | Gold Standard 2066 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Global Mangrove Trust Blue Carbon Restoration Project in Indonesia | Gold Standard 4852 | Indonesia | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| Global Mangrove Trust Blue Carbon Restoration Project in Indonesia - Sumatra 1 | Gold Standard 4853 | Indonesia | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| GS23213 VPA-1 Ibu Bakau: Community-powered Mangrove Afforestation in Indonesia 1 | Gold Standard 4945 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| GS23213 VPA-2 Ibu Bakau: Community-powered Mangrove Afforestation in Indonesia 2 | Gold Standard 4946 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| GS23331 – VPA 1 – Sustainable Electric Motorbike Project by ESB and EcoSecurities | Gold Standard 5254 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| GS790_Sustainable Small Hydropower PoA - 1.1 MW Manggani Mini Hydroelectric Project, West Sumatera, Indonesia (300469) | Gold Standard 1183 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| GS790_Sustainable Small Hydropower Programme of Activities (PoA) - CPA Manggani Hydroelectric Project Pre-CDM VER | Gold Standard 1200 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| GS790_Sustainable Small Hydropower Programme of Activities (PoA) in Indonesia (300218) | Gold Standard 1197 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| Ibu Bakau: Community-powered Mangrove Afforestation in Indonesia | Gold Standard 4944 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| Indonesia Domestic Biogas Programme of Activities (IDBP) | Gold Standard 1619 | Indonesia | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| Indonesia Domestic Biogas Programme of Activities (IDBP) (ID 1172), VPA-2 | Gold Standard 1620 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Indonesia Domestic Biogas Programme of Activities (IDBP) , VPA-1 | Gold Standard 110 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Indonesia Sustainable Ride Programme by EcoSecurities | Gold Standard 5253 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| KIPRAH community based integrated waste management project, Indonesia | Gold Standard 170 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Liki Pinangawan Muaralaboh Geothermal Power Plant | Gold Standard 4163 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Methane Recovery and Utilization at PT. Musim Mas Palm Oil Mill in Pangkalan Lesung, Riau Indonesia | Gold Standard 1268 | Indonesia | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| Nazava Water Filter Project | Gold Standard 1597 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Project Kamojang unit 5 PT. Pertamina Geothermal Energy | Gold Standard 334 | Indonesia | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| Project Karaha Unit 1 PT. Pertamina Geothermal Energy | Gold Standard 335 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Project Lumut Balai Unit 1 - 2 PT. Pertamina Geothermal Energy | Gold Standard 316 | Indonesia | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| Project Lumut Balai Unit 3 - 4 PT. Pertamina Geothermal Energy | Gold Standard 317 | Indonesia | GOLD_STANDARD_CERTIFIED_DESIGN | Registered | 2026-09-20* |
| Project Ulubelu Unit 3 - 4 PT. Pertamina Geothermal Energy | Gold Standard 315 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Recyling Used Cooking Oil into Biodiesel in Bali | Gold Standard 229 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| RVPA-1 Methane Reduction by Alternate Wetting and Drying (AWD) in Indonesia | Gold Standard 5336 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| Sidrap Wind Farm Project Phase 1 | Gold Standard 1618 | Indonesia | GOLD_STANDARD_CERTIFIED_PROJECT | Registered | 2026-09-20* |
| Sustainable Rice Production in Southeast and South Asia | Gold Standard 5335 | Indonesia | LISTED | Pipeline | 2026-09-20* |
| 1.6MW Solar PV Power Plant Project in Jakabaring Sport City | JCM (Japan) ID018 | Indonesia | Project registered | Registered | 2026-10-31* |
| 10MW Mini Hydro Power Plant Project in North Sumatra | JCM (Japan) ID027 | Indonesia | Project registered | Registered | 2026-10-31* |
| 4.2MW Rooftop Solar Power Project to Pharmaceutical Factories, Vehicles Dealers, and Timber Factories | JCM (Japan) ID033 | Indonesia | Project registered | Registered | 2026-10-31* |
| 6MW Mini Hydro Power Plant Project in West Pasaman, West Sumatra | JCM (Japan) ID037 | Indonesia | Validation | In validation | 2026-10-31* |
| Energy Saving by Introducing High Efficiency Autoclave to Infusion Manufacturing Factory | JCM (Japan) ID029 | Indonesia | Project registered | Registered | 2026-10-31* |
| Energy Saving by Introducing High Efficiency Autoclave to Infusion Manufacturing Factory 2 | JCM (Japan) ID034 | Indonesia | Project registered | Registered | 2026-10-31* |
| Energy saving by optimum operation at an oil refinery | JCM (Japan) ID014 | Indonesia | Project registered | Registered | 2026-10-31* |
| Energy Saving for Air-Conditioning and Process Cooling by Introducing High-efficiency Centrifugal Chiller | JCM (Japan) ID001 | Indonesia | Project registered | Registered | 2026-10-31* |
| Energy Saving for Air-Conditioning at Shopping Mall with High Efficiency Centrifugal Chiller | JCM (Japan) ID009 | Indonesia | Project registered | Registered | 2026-10-31* |
| Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Batang, Central Java (Phase 2) | JCM (Japan) ID005 | Indonesia | Project registered | Registered | 2026-10-31* |
| Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Karawang West Java | JCM (Japan) ID004 | Indonesia | Project registered | Registered | 2026-10-31* |
| Energy Saving for Industrial Park with Smart LED Street Lighting System | JCM (Japan) ID025 | Indonesia | Project registered | Registered | 2026-10-31* |
| Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia | JCM (Japan) ID007 | Indonesia | Request for Registration withdrawn | Inactive | 2026-10-31* |
| Energy saving through introduction of Regenerative Burners for aluminum holding furnaces of the automotive components manufacture in the Republic of Indonesia | JCM (Japan) ID010 | Indonesia | Project registered | Registered | 2026-10-31* |
| GHG emission reductions through utility facility operation optimization system for refineries in the Republic of Indonesia | JCM (Japan) ID012 | Indonesia | Project registered | Registered | 2026-10-31* |
| Installation of Aerator for Industrial Wastewater Treatment Facility in Rubber Factory | JCM (Japan) ID031 | Indonesia | Validation | In validation | 2026-10-31* |
| Installation of all-electric injection molding machine with power regeneration to plastics & packaging manufacturing plants | JCM (Japan) ID030 | Indonesia | Validation | In validation | 2026-10-31* |
| Installation of gas engine cogeneration system to supply electricity and heat to the vehicle manufacturing factory of PT. Toyota Motor Manufacturing Indonesia | JCM (Japan) ID019 | Indonesia | Project registered | Registered | 2026-10-31* |
| Installation of Inverter-type Air Conditioning System, LED Lighting and Separate Type Fridge Freezer Showcase to Grocery Stores in Republic of Indonesia | JCM (Japan) ID006 | Indonesia | Project registered | Registered | 2026-10-31* |
| Installation of Solar Power System and Storage Battery to Commercial Facility | JCM (Japan) ID023 | Indonesia | Project registered | Registered | 2026-10-31* |
| Installation of Tribrid System to mobile communication’s Base Transceiver Stations in Republic of Indonesia | JCM (Japan) ID016 | Indonesia | Project registered | Registered | 2026-10-31* |
| Introducing double-bundle modular electric heat pumps at AXIA SOUTH CIKARANG Tower 2 | JCM (Japan) ID008 | Indonesia | Project registered | Registered | 2026-10-31* |
| Introduction of 0.5MW Solar Power System to Aroma and Food Ingredients Factory | JCM (Japan) ID017 | Indonesia | Project registered | Registered | 2026-10-31* |
| Introduction of 2.1MW Rooftop Solar Power System in Woodworking Factories | JCM (Japan) ID036 | Indonesia | Validation | In validation | 2026-10-31* |
| Introduction of 3.1MW Rooftop Solar Power System to Fast-Moving Consumer Goods and Printing Factories in Java Island | JCM (Japan) ID039 | Indonesia | Validation | In validation | 2026-10-31* |
| Introduction of Absorption Chiller to Chemical Factory | JCM (Japan) ID024 | Indonesia | Project registered | Registered | 2026-10-31* |
| Introduction of CNG-Diesel Hybrid Equipment to Public Bus in Semarang | JCM (Japan) ID032 | Indonesia | Project registered | Registered | 2026-10-31* |
| Introduction of Gas Co-generation System and Absorption Chiller to Motor Parts Factory | JCM (Japan) ID028 | Indonesia | Validation | In validation | 2026-10-31* |
| Introduction of Gas Co-generation System and Absorption Chiller to Motor Parts Factory | JCM (Japan) ID040 | Indonesia | Validation | In validation | 2026-10-31* |
| Introduction of High Efficiency Once-through Boiler in Golf Ball Factory | JCM (Japan) ID022 | Indonesia | Project registered | Registered | 2026-10-31* |
| Introduction of High-Efficiency Looms in Weaving Mill | JCM (Japan) ID020 | Indonesia | Project registered | Registered | 2026-10-31* |
| Introduction of High-efficiency Once-through Boiler in Film Factory | JCM (Japan) ID021 | Indonesia | Project registered | Registered | 2026-10-31* |
| Introduction of High-efficiency Once-through Boiler System to Chemical Factory | JCM (Japan) ID038 | Indonesia | Validation | In validation | 2026-10-31* |
| Introduction of LED Lighting to UNIQLO Sales Stores | JCM (Japan) ID026 | Indonesia | Project registered | Registered | 2026-10-31* |
| Power generation by waste heat recovery in the PT Semen Indonesia (Persero) Tbk factory in Tuban | JCM (Japan) ID013 | Indonesia | Project registered | Registered | 2026-10-31* |
| Project of Introducing High Efficiency Refrigerator to a Food Industry Cold Storage in Indonesia | JCM (Japan) ID002 | Indonesia | Project registered | Registered | 2026-10-31* |
| Project of Introducing High Efficiency Refrigerator to a Frozen Food Processing Plant in Indonesia | JCM (Japan) ID003 | Indonesia | Project registered | Registered | 2026-10-31* |
| Reducing GHG emission at textile factories by upgrading to air-saving loom | JCM (Japan) ID015 | Indonesia | Project registered | Registered | 2026-10-31* |
| Reduction of Energy Consumption by Introducing an Energy-Efficient Waste Paper Processing System into a Packaging Paper Factory in Bekasi, West Java | JCM (Japan) ID011 | Indonesia | Project registered | Registered | 2026-10-31* |
| Rehabilitation Project of Power Generation System at Karai 7 Mini Hydro Power Plant | JCM (Japan) ID035 | Indonesia | Project registered | Registered | 2026-10-31* |
| 210 MW Musi Hydro Power Plant, Bengkulu | Verra VCS 487 | Indonesia | Registered | Registered | 2026-09-20* |
| 50 MW Sipansihaporas Hydro Power Plant, North Sumatra | Verra VCS 486 | Indonesia | Registered | Registered | 2026-09-20* |
| 55.5 MW Natural Gas Power Generation Project at Batu Aji Village, Riau Island, Indonesia, by PT Dalle Energy Batam. | Verra VCS 243 | Indonesia | Late to Verify | At risk | 2026-09-20* |
| 82 MW Lau Renun Hydro Power Plant, North Sumatra | Verra VCS 488 | Indonesia | Registered | Registered | 2026-09-20* |
| AgriCapture Southeast Asia Rice Methane Project | Verra VCS 5956 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Agroforestry and Reforestation for Carbon Sequestration in Indonesia | Verra VCS 3012 | Indonesia | Registration requested | In validation | 2026-09-20* |
| Aquila EV Grouped Project | Verra VCS 6156 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Bantargebang Landfill Gas Management & Power Generation | Verra VCS 967 | Indonesia | Late to Verify | At risk | 2026-09-20* |
| Barito Lestari Forest Restoration Project (BLFRP) | Verra VCS 3493 | Indonesia | Pipeline listing requested (under development) | Pipeline | 2026-09-20* |
| Barito Lestari Peatland Project (BLPP) | Verra VCS 3494 | Indonesia | Pipeline listing requested (under development) | Pipeline | 2026-09-20* |
| Biogas Project PT Rohul Sawit Industri | Verra VCS 5323 | Indonesia | Registration and verification approval requested | In validation | 2026-09-20* |
| BLUERIZON PROJECT: BLUE CARBON PROJECT ON TIDAL WETLAND OF MANGROVES IN JAVA-1, INDONESIA | Verra VCS 5448 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Capacity Upgrade of Gunung Salak Geothermal Power Plant Project, Indonesia | Verra VCS 144 | Indonesia | Late to Verify | At risk | 2026-09-20* |
| CARBON AGROFORESTRY IN CIMANUK, PROGO AND BRANTAS WATERSHED - INDONESIA | Verra VCS 5620 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Central Kalimantan Murung Raya IFM Project | Verra VCS 6085 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Central Seram IFM RestorationWISE Project | Verra VCS 5524 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Charged EV Project in Indonesia | Verra VCS 5930 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Climate Quest Wastewater Methane Avoidance and Renewable Electricity Grouped Project (Indonesia) | Verra VCS 6094 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Community Collection and Ocean Bound Plastic Waste Recycling in Indonesia | Verra VCS 5967 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Delta Kapuas Project | Verra VCS 5834 | Indonesia | Pipeline listing requested (under validation) | Pipeline | 2026-09-20* |
| Enviro Rise | Verra VCS 5631 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Forest Landscape Restoration in North Sulawesi Province | Verra VCS 5891 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Gerbang Barito REDD+ Project | Verra VCS 5799 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Gunung Lumut Landscape Project | Verra VCS 5873 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Gunung Mas Community Forest Restoration Project | Verra VCS 5905 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Halmahera Zero-Waste Renewable Energy and Biochar Project | Verra VCS 4611 | Indonesia | Registration requested | In validation | 2026-09-20* |
| Hamparan biogas project | Verra VCS 3297 | Indonesia | Registration requested | In validation | 2026-09-20* |
| HBM Peatland Conservation Project | Verra VCS 5933 | Indonesia | Under validation (Public comment period open) | In validation | 2026-10-24 |
| Hutani Berkah Mulia | Verra VCS 5534 | Indonesia | Pipeline listing requested (under development) | Pipeline | 2026-09-20* |
| INDONESIA METHANE AVOIDANCE FROM BIOMASS AND WASTEWATER PROJECT BY PTEC | Verra VCS 5996 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Installation of high efficiency wood burning cookstoves in Indonesia 1 | Verra VCS 3327 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Installation of high efficiency wood burning cookstoves in Indonesia 2 | Verra VCS 3328 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| JATI DHARMA INDAH PLYWOOD INDUSTRIES IFM PROJECT 1 | Verra VCS 5722 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Kahayan Conservation Project | Verra VCS 4292 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| KALTIM HUTAMA IFM PROJECT | Verra VCS 5798 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Kapuas Pisau Conservation Project | Verra VCS 5736 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Katingan Peatland Restoration and Conservation Project | Verra VCS 1477 | Indonesia | Registered | Registered | 2026-09-20* |
| Kayong Utara Conservation and Restoration Project | Verra VCS 3446 | Indonesia | Pipeline listing requested (under development) | Pipeline | 2026-09-20* |
| KIS BIOFUELS- UKINDO PROJECT | Verra VCS 4705 | Indonesia | Registered | Registered | 2026-09-20* |
| KOPI LESTARI AGROFORESTRY AND LAND REHABILITATION WITH SMALLHOLDER FARMERS IN INDONESIA | Verra VCS 3587 | Indonesia | Inactive | Inactive | 2026-09-20* |
| Kubu Peatland Project | Verra VCS 5371 | Indonesia | Registration and verification approval requested | In validation | 2026-09-20* |
| KUBURAYA MANGROVE: CONCESSION TO CONSERVATION PROJECT | Verra VCS 5475 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Kupu-Kupu Project - Enhancing Livelihoods through Mangrove Restoration and Silvofishery in South Sulawesi | Verra VCS 5032 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Lahendong Unit 5 & Unit 6 Geothermal Project | Verra VCS 1778 | Indonesia | Withdrawn | Inactive | 2026-09-20* |
| Mangrove restoration and coastal greenbelt protection in the East coast of Aceh and North Sumatra Province, Indonesia | Verra VCS 1493 | Indonesia | Verification approval requested | Registered | 2026-09-20* |
| MedcoEnergi Associated Gas Recovery and Utilization Project | Verra VCS 409 | Indonesia | Late to Verify | At risk | 2026-09-20* |
| METHANE RECOVERY IN WASTEWATER TREATMENT, PROJECT AIN07-W-05, SUMATERA UTARA, INDONESIA | Verra VCS 866 | Indonesia | Late to Verify | At risk | 2026-09-20* |
| Mobuya Mini Hydro Power Plant 3 x 1000 kW North Sulawesi, Indonesia | Verra VCS 238 | Indonesia | Late to Verify | At risk | 2026-09-20* |
| Monsoon Methane Avoidance from Industrial Wastewater in Indonesia Grouped Project | Verra VCS 5292 | Indonesia | Registration requested | In validation | 2026-09-20* |
| Muara Teweh Conservation Project | Verra VCS 4520 | Indonesia | Pipeline listing requested (under validation) | Pipeline | 2026-09-20* |
| Nunukan Mangrove & Peatland Project | Verra VCS 5845 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| OKI REDD+ Project | Verra VCS 2395 | Indonesia | Registration requested | In validation | 2026-09-20* |
| Padang Tikar Landscape | Verra VCS 3226 | Indonesia | Withdrawn | Inactive | 2026-09-20* |
| Papua Mimika and Dogiyai IFM Project | Verra VCS 6287 | Indonesia | Pipeline listing requested (under development) | Pipeline | 2026-11-20 |
| PFC Emission Reductions at PT. Indonesia Asahan Aluminium (PT. INALUM) Kuala Tanjung - CER Conversion | Verra VCS 1750 | Indonesia | Units transferred from approved GHG program | Registered | 2026-09-20* |
| PLUM Peat and Mangrove Conservation and Restoration Project (PLUM Project) | Verra VCS 4967 | Indonesia | Registration requested | In validation | 2026-09-20* |
| Preserving Peat Swamp Forest Ecosystem Through Redd+ Activity In Kampar Peninsula Riau-Indonesia | Verra VCS 1498 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| PROJECT LESTARI | Verra VCS 5585 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Rangkong Basaken Landscape Conservation Project | Verra VCS 6157 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Recovery and Avoidance of methane from Industrial wastewater treatment project at Agro Muara Rupit mill, Indonesia. | Verra VCS 5962 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| Recovery and Avoidance of Methane from Industrial Wastewater Treatment Project at PT SMART Tbk. (PKS Padang Halaban), Indonesia. | Verra VCS 6027 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| RECOVERY AND AVOIDANCE OF METHANE FROM INDUSTRIAL WASTEWATER TREATMENT PROJECT AT TSE GROUP, INDONESIA | Verra VCS 4792 | Indonesia | Registration requested | In validation | 2026-09-20* |
| Recovery and Avoidance of Methane from Industrial Wastewater Treatment Projects at Bina Pitri Jaya mill, Indonesia | Verra VCS 5975 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| REDUCING EMISSIONS FROM DEFORESTATION DUE TO SLASH-AND-BURN CORN BY INTRODUCING CACAO FARMING IN GORONTALO PROVINCE, INDONESIA | Verra VCS 4186 | Indonesia | Rejected by Administrator | Inactive | 2026-09-20* |
| RePL Recycling plastic project | Verra VCS 4445 | Indonesia | Inactive | Inactive | 2026-09-20* |
| Riau Ecosystem Restoration Carbon Project | Verra VCS 2403 | Indonesia | Verification approval requested | Registered | 2026-09-20* |
| Rimba Raya Biodiversity Reserve Project | Verra VCS 674 | Indonesia | Late to Verify | At risk | 2026-09-20* |
| Sambu Group Biomass Energy Transition Grouped Project | Verra VCS 6104 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Sanggala Corridor Project | Verra VCS 5458 | Indonesia | Registration requested | In validation | 2026-09-20* |
| Seram Climate and Conservation (SERCOVA) | Verra VCS 5283 | Indonesia | Registration requested | In validation | 2026-09-20* |
| Seruyan Ecosystem Restoration Project | Verra VCS 6254 | Indonesia | Under validation (Public comment period open) | In validation | 2026-10-02 |
| Siluk Peatlands Conservation Project (SPCP) | Verra VCS 5695 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| South Barito Kapuas Project | Verra VCS 4782 | Indonesia | Registration and verification approval requested | In validation | 2026-09-20* |
| Sumatra Merang Peatland Project (SMPP) | Verra VCS 1899 | Indonesia | Registered | Registered | 2026-09-20* |
| Tanimbar Community Forest Restoration Project | Verra VCS 5796 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| The Mayas Project | Verra VCS 3591 | Indonesia | Registered | Registered | 2026-09-20* |
| The Pekanbaru Suntara Peatland Project (PSPP) | Verra VCS 5520 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| TSH GROUPED BIOGAS RECOVERY PROJECT | Verra VCS 4467 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| Water Purification System for Safe Drinking Water (SDW) in Indonesia | Verra VCS 4103 | Indonesia | Registration and verification approval requested | In validation | 2026-09-20* |
| Wayang Windu Phase 2 Geothermal Power Project | Verra VCS 688 | Indonesia | Late to Verify | At risk | 2026-09-20* |
| West Kalimantan Kapuas Hulu IFM Project | Verra VCS 6128 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
| WEST NUSA TENGGARA ISLANDS AGROFORESTRY PROJECT | Verra VCS 6277 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-10-14 |
| WEST SERAM REDD+ and AGARWOOD ForestWise PROJECT | Verra VCS 4381 | Indonesia | Under validation (Public comment period closed) | In validation | 2026-09-20* |
| YAKOPI Mangrove Restoration Project | Verra VCS 5545 | Indonesia | Pipeline Listing (under development) approved | Pipeline | 2026-09-20* |
* already listed when we started reading that registry daily; the listing date is earlier.