Country guide · 🇮🇩 Indonesia

Indonesia's carbon market: the region's biggest pipeline, reopened to the world

A new presidential regulation in October 2025 removed the main barriers to selling Indonesian credits abroad, and in July 2026 the first four forest projects were cleared for international trading. Indonesia has the largest pipeline and the largest issuance in Southeast Asia.

By Carbon.Supply Analyst · Updated 1 October 2026
113projects on Verra, Gold Standard and other registries today
38registered (8 flagged late to verify)
70in pipeline or validation, not yet issuing
98.1Mcredits issued to date across 26 projects (81.9M retired)

The policy picture

Indonesia spent 2023 and 2024 holding its credits at home. Presidential Regulation 110/2025, signed in October 2025, reversed that. Carbon trading may now proceed before Indonesia meets its own NDC targets, the earlier requirement for mutual recognition agreements with standards such as Verra and Gold Standard is gone as a gateway, and a steering committee chaired by the Coordinating Minister for Food oversees the market. The 2025 agreements with Verra, Gold Standard, Plan Vivo and the Global Carbon Council remain as quality signals.

The implementing rules followed in 2026: forestry ministry regulations on offsets, OJK rules aligning the exchange, and a Ministry of Environment regulation that switched on the new Carbon Unit Registry System on 9 July, with every transaction to be recorded within two working days. On 6 July the government cleared the first four forestry projects for international trading, Katingan Mentaya, Sumatera Merang, The Mayas and Bujang Raba, together about 225,000 hectares and more than 30 million tonnes expected through Verra and Plan Vivo. We have not seen confirmation that a corresponding adjustment has yet been applied.

On the compliance side, IDXCarbon has run since September 2023 and opened to international buyers in January 2025, but international volume has been thin. The power-sector emissions trading scheme is in its second phase (2025–27), now covering captive coal and gas plants as well as grid-connected coal. The carbon tax written into law in 2021 has never been enforced.

Abroad, Indonesia signed an Article 6 agreement with Norway in June 2025, and a carbon credit MoU with Singapore on 6 July 2026; an Implementation Agreement with Singapore is still to come, so Indonesian projects are not yet eligible for Singapore's tender. In parliament, some members have argued for a national carbon balance before more international sales. That is a debate, not a ban.

What the registries show

Indonesia has the largest pipeline in Southeast Asia and has issued more credits than any other country in the region. The issuance is concentrated: two peatland and REDD+ projects in Central Kalimantan, Katingan and Rimba Raya, account for most of it, and Rimba Raya is now flagged by Verra as late to verify. The pipeline is forestry-heavy too, with REDD+, peatland and mangrove projects across Kalimantan, Sumatra and Maluku, alongside wastewater methane, geothermal and hydropower.

Where the credits have come from

ProjectProponentTypeIssuedRetired
Katingan Peatland Restoration and Conservation ProjectVerra VCS 1477 · Central KalimantanPT. Rimba Makmur Utama (PT. RMU)Wetland Restoration40M37.1M
Rimba Raya Biodiversity Reserve ProjectVerra VCS 674 · Central KalimantanInfiniteEARTHREDD+33.6M26.8M
210 MW Musi Hydro Power Plant, BengkuluVerra VCS 487 · BengkuluPT. PLN (Persero)Hydropower7.6M5.9M
Sumatra Merang Peatland Project (SMPP)Verra VCS 1899 · South Sumatra ProvinceMultiple Project ProponentsWetland Restoration2.6M2.6M
82 MW Lau Renun Hydro Power Plant, North SumatraVerra VCS 488 · North Sumatra ProvincePT. PLN (Persero)Hydropower2.6M2.2M
Liki Pinangawan Muaralaboh Geothermal Power PlantGold Standard 4163PT. SUPREME ENERGY MUARA LABOHGeothermal1.9M6,500

Credits issued and retired to date, Berkeley Voluntary Registry Offsets Database (2026-06 release).

The largest projects not yet issuing

ProjectProponentStatusClaimed t/yr
Installation of high efficiency wood burning cookstoves in Indonesia 1Verra VCS 3327C-Quest Capital Stoves Asia LimitedPipeline3.3M
Installation of high efficiency wood burning cookstoves in Indonesia 2Verra VCS 3328C-Quest Capital Stoves Asia LimitedPipeline3.3M
Tanimbar Community Forest Restoration ProjectVerra VCS 5796 · MalukuAsia Assets Developments Co. Ltd.In validation2.6M
Delta Kapuas ProjectVerra VCS 5834 · West KalimantanPT Belantara Sejahtera MandiriPipeline2.4M
PROJECT LESTARIVerra VCS 5585 · NORTH KALIMANTANPT. AGRA INTI INVESTAMAPipeline2.4M
The Mayas ProjectVerra VCS 3591 · West KalimantanPT Mohairson Pawan KhatulistiwaIn validation2.3M

Claimed tonnes per year are the proponent's own estimate as filed with the registry, before validation.

Who is developing

South Pole is the most active developer by project count. PLN, the state utility, holds the large hydropower projects. The forestry pipeline is led by Indonesian concession holders, often working with Singapore-registered developers.

DeveloperProjectsRegisteredPipelineTypes
South Pole Ltd853Geothermal, Hydropower
KNOWLEDGE INTEGRATION SERVICES SINGAPORE PTE. LTD.514Methane Recovery in Wastewater
PT. PLN (Persero)330Hydropower
Value Network Ventures Pte. Ltd.303Wetland Restoration
PT BIRU KARBON NUSANTARA330Biodigesters
C-Quest Capital Stoves Asia Limited202Cookstoves
Asia Assets Developments Co. Ltd.202Afforestation/Reforestation
Kosher Climate India Pvt Ltd.220Solar - Centralized, Wind
EcoSecurities Group Limited202Electric Vehicles & Charging
RIZE PTE. LTD.202Rice Emission Reductions

Developers grouped across registries and spellings by CarbonIntel. A project with several proponents counts for each.

Latest registry moves

What we are watching

The full list, updated daily

Every Indonesia project, with its status history

All 113 projects on the registries we read, each with its developer, status, and every change since we started reading.

Open the Indonesia page →
Sources
Free weekly read

Every registry move in Southeast Asia, weekly.

The Southeast Asia edition tracks every project in these guides, flags status changes the day they happen, and explains what they mean for buyers and developers.

Get the free weekly read →
More country guides
🇵🇭 Philippines🇻🇳 Vietnam🇹🇭 Thailand🇲🇾 Malaysia🇰🇭 Cambodia🇱🇦 Laos🇸🇬 Singapore🇲🇲 Myanmar🇹🇱 Timor-Leste